Intelligent system for generating and executing a sheet metal bending plan
Abstract
An intelligent sheet metal bending system is disclosed, having a
cooperative generative planning system. A planning module interacts with
several expert modules to develop a bending plan. The planning module
utilizes a state-space search algorithm. Computerized methods are
provided for selecting a robot gripper and a repo gripper, and for
determining the optimal placement of such grippers as they are holding a
workpiece being formed by the bending apparatus. Computerized methods are
provided for selecting tooling to be used by the bending apparatus, and
for determining a tooling stage layout. An operations planning method is
provided which allows the bending apparatus to be set up concurrently
while time-consuming calculations, such as motion planning, are
performed. An additional method or system is provided for positioning
tooling stages by using a backstage guide member which guides placement
of a tooling stage along the die rail of the bending apparatus. A method
is provided for learning motion control offset values, and for
eliminating the need for superfluous sensor-based control operations once
the motion control offset values are known. The planning system may be
used for facilitating functions such as design and assembly system, which
may perform designing, costing, scheduling, and/or manufacture and
assembly.
| Inventors: |
Bourne, David Alan; (Pittsburgh, PA)
; Williams, Duane Thomas; (Pittsburgh, PA)
; Kim, Kyoung Hung; (Pittsburgh, PA)
; Krishnan, Sivaraj Sivarama; (Bangalore, IN)
; Hazama, Kensuke; (Buena Park, CA)
|
| Correspondence Address:
|
GREENBLUM & BERNSTEIN, P.L.C.
1950 ROLAND CLARKE PLACE
RESTON
VA
20191
US
|
| Assignee: |
AMADA AMERICA, INC.
Buena Park
CA
AMADA COMPANY, LTD.
Kanagawa
|
| Serial No.:
|
245313 |
| Series Code:
|
10
|
| Filed:
|
September 18, 2002 |
| Current U.S. Class: |
700/165 |
| Class at Publication: |
700/165 |
| International Class: |
G06F 019/00 |
Claims
What is claimed is:
1. In a computer having at least one processor and a memory, a device that
selects a gripper that holds a workpiece to be utilized by a bending
apparatus that bends unfinished workpieces formed of sheets of malleable
material, the device comprising: a reader; a former; a chooser; a
predictor; a determiner; and an adjuster; wherein said reader reads
information describing geometry of a library of grippers to be chosen
from, said former forms a set of available grippers excluding grippers
that have certain undesired geometric features, said chooser chooses a
gripper from the set of available grippers as a function of width of the
gripper, length of the gripper, and knuckle height of the gripper, said
predictor is adapted to predict, for each gripper within the set of
available grippers, a repo number equal to an estimated number of times
the bending apparatus will need to change the position at which the
gripper holds the workpiece in order to perform a complete sequence of
bending operations on the workpiece, said determiner is adapted to
determine the smallest predicted repo number, and said adjuster is
adapted to adjust the set of available grippers to include the available
grippers having a repo number equal to the smallest predicted repo
number, before choosing a gripper as a function of the width, length and
knuckle height of the gripper.
Description
1. RELATED APPLICATION DATA
[0001] This is a Continuation application of U.S. application Ser. No.
09/930,252 filed Aug. 16, 2001, which was a Continuation of U.S.
application Ser. No. 09/207,268 filed Dec. 8, 1998, which was a
Continuation of U.S. patent application Ser. No. 08/386,369, filed Feb.
9, 1995, which was a Continuation of U.S. application Ser. No.
08/338,113, filed Nov. 9, 1994, the contents of which are expressly
incorporated by reference herein in their entireties. The present
disclosure is also related to the disclosure provided in the following
U.S. applications filed on even date herewith: "Method for
Planning/Controlling Robot Motion", U.S. patent application Ser. No.
08/338,115, filed on Nov. 9, 1994; "Methods for Backgaging and
Sensor-Based Control of Bending Operations", U.S. patent application Ser.
No. 08/338,153, filed on Nov. 9, 1994; and "Fingerpad Force Sensing
System", U.S. patent application Ser. No. 08/338,095, filed on Nov. 9,
1994; and the disclosures of all of these applications are expressly
incorporated by reference herein in their entireties.
2. COMPUTER PROGRAM LISTING APPENDIX
[0002] This application includes a computer program listing appendix for
Appendices A-D. The computer program listing appendix consists of one
CD-ROM including 30 images.
3. COPYRIGHT NOTICE
[0003] A portion of the disclosure of this patent document contains
material which is subject to copyright protection. The copyright owner
has no objection to the facsimile reproduction by anyone of the patent
disclosure, as it appears in the Patent and Trademark Office patent files
or records, but otherwise reserves all copyright rights whatsoever.
BACKGROUND OF THE INVENTION
[0004] b 1. Field of the Invention
[0005] The present invention is directed to methods and subsystems which
may be provided in an intelligent bent sheet metal designing, planning
and manufacturing system and the like.
[0006] 2. Discussion of Background Information
[0007] FIGS. 1-3 illustrate, in a simplified view, an example conventional
bending workstation 10 for bending a sheet metal part (workpiece) 16
under the control of a manually created program downloaded to various
control devices provided within the workstation. The illustrated bending
workstation 10 is a BM100 Amada workstation.
[0008] (a) The Hardware and its Operation
[0009] FIG. 1 shows an overall simplified view of bending workstation 10.
FIG. 2 shows a partial view of a press brake 29, positioned to perform a
bend an a workpiece 16. The elements shown in FIG. 2 include a robot arm
12 having a robot arm gripper 14 grasping a workpiece 16, a punch 18
being held by a punch holder 20, and a die 19 which is placed on a die
rail 22. A backgage mechanism 24 is illustrated to the left of punch 18
and die 19.
[0010] As shown in FIG. 1, bending workstation 10 includes four
significant mechanical components a press brake 29 for bending workpiece
16; a five degree-of-freedom (5 DOF) robotic manipulator (robot) 12 for
handling and positioning workpiece 16 within press brake 29; a material
loader/unloader (L/UL) 30 for loading and positioning a blank workpiece
at a location for, robot 12 to grab, and for unloading finished
workpieces; and a repositioning gripper 32 for holding workpiece 16 while
robot 12 changes its grasp.
[0011] Press brake 29 includes several components as illustrated in FIGS.
1-3. Viewing FIG. 3, press brake 29 includes at least one die 19 which is
placed an a die rail 22, and at least one corresponding punch tool 18
which is held by a punch tool holder 20. Press brake 29 further includes
a backgage mechanism 24.
[0012] As shown in FIG. 2, robot arm 12 includes a robot arm gripper 14
which is used to grasp workpiece 16. As shown in FIG. 1, material
leader/unloader 30 includes several suction cups 21 which create an
upwardly directed suction force for lifting a sheet metal workpiece 16,
thereby allowing L/UL 30 to pass workpiece 16 to gripper 14 of robot 12,
and to subsequently retrieve a finished workpiece 16 from gripper 14 and
unload the finished workpiece.
[0013] In operation, loader/unloader (L/UL) 30 will lift a blank workpiece
16 from a receptacle (not shown), and will raise and move workpiece 16 to
a position to be grabbed by gripper 14 of robot 12. Robot 12 then
maneuvers itself to a position corresponding to a particular bending
stage located within bending workstation 10. Referring to each of FIGS. 1
and 3, stage 1 comprises the stage at the leftmost portion of press brake
29, and stage 2 is located to the right of stage 1 along die rail 22.
[0014] If the first bend is to be made at stage 1, robot 12 will move
workpiece 16 to stage 1, and as shown in FIG. 2, will maneuver workpiece
16 within press brake 29, at a location between punch tool 13 and die 19,
until it reaches and touches a backstop portion of backgage mechanism 24.
With the aid of backgage mechanism 24, the position of workpiece 16 is
adjusted by robot arm 12. Then, a bend operation is performed an
workpiece 16 at stage 1. In performing the bend operation, die rail 22
moves upward (along a D axis), as indicated by the directional arrow A in
FIG. 2. As punch tool 18 and die 19 simultaneously contact workpiece 16,
so that workpiece 16 assumes a relatively stable position within press
brake 29, gripper 14 will release its grasp on workpiece 16, and robot 12
will move gripper 14 away from workpiece 16. Press brake 29 will then
complete its bending of workpiece 16, by completing the upward movement
of die 19 until the proper bend has been formed.
[0015] Once die 19 is engaged against punch tool 13, holding workpiece 16
in its bent state, before disengaging die 19 by lowering press brake 29,
robot arm 12 will reposition its robot arm gripper 14 to hold workpiece
16. Once gripper 14 is holding workpiece 16, die 19 will be disengaged by
releasing press brake 29. Robot 12 then maneuvers and repositions
workpiece 16 in order to perform the next bend in the particular bend
sequence that has been programmed for workpiece 16. The next bend within
the bend sequence may be performed either at the same stage, or at a
different stage, such as stage 2, depending upon the type of bends to be
performed, and the tooling provided within press brake 29.
[0016] Depending upon the next bend to be performed, and the configuration
of workpiece 16, the gripping position of gripper 14 may need to be
repositioned. Repositioning gripper 32, shown in FIG. 1, is provided for
this purpose. Before performing the next bend, for which repositioning of
robot gripper 14 is needed, workpiece 16 will be moved by robot 12 to
repositioning gripper 32. Repositioning gripper 32 will then grasp
workpiece 16 so that robot gripper 14 can regrip workpiece 16 at a
location appropriate for the next bend or sequence of bends.
[0017] (b) The Control System
[0018] The bending workstation 10 illustrated in FIG. 1 is controlled by
several control devices which are housed separately, including an
MM20-CAPS interface 40, a press brae controller 42, a robot controller
44, and a lead/unload unit controller 46. Press brake controller 42
comprises an NC9R press brake controller, and robot controller 44
comprises a 25B robot controller, which are each supplied by Amada. Each
of press brake controller 42 and robot controller 44 have their own CPU
and programming environments Load/unload unit controller 46 comprises a
stand alone Programmable Logic Controller (PLC), and is wired to
respective consoles provided for press brake controller 42 and robot
controller 44.
[0019] Each of controllers 42, 44, and 46 has a different style bus,
architecture, and manufacturer. They are coordinated primarily by
parallel I/O signals. Serial interfaces are provided far transporting
bending and robot programs to the controllers, each of which is
programmed in a different manner. For example, logic diagrams are used to
program the PLC of the load/unload controller 46, and Re is used to
program robot controller 44.
[0020] (c) The Design/Manufacture Process
[0021] The overall design/manufacture process for bending sheer metal
includes several steps. First, a part to be produced is typically
designed using an appropriate CAD system. Then, a plan is generated which
defines the tooling to be used and a sequence of bends to be performed.
Once the needed tooling is determined, an operator will begin to set up
the bending workstation. After the workstation is set up, the plan is
executed, i.e., a workpiece is loaded and operation of the bending
workstation is controlled to execute the complete sequence of bends an a
blank sheet metal workpiece. The results of the initial runs of the
bending workstation are then fed back to the design step, where
appropriate modifications may be made in the design of the part in view
of the actual operation of the system.
[0022] In the planning step, a plan is developed for bending workstation
10 in order to configure the system to perform a sequence of bending
operations. Needed hardware must be selected, including appropriate dies,
punch
tools, grippers, and so on. In addition, the bending sequence must
be determined, which includes the ordering and selection of bends to be
performed by bending workstation 10. In selecting the hardware, and in
determining the bending sequence, along with other parameters, software
will be generated to operate bending workstation 10, so that bending
workstation 10 can automatically perform various operations of the
bending process.
[0023] A plan for a BM100 bending workstation includes generated software
such as an NC9R press brake program and a 25B RML robot program. Each of
these programs may be created with the use of an initial part design
created from a CAD system. Both the robot program and the bending program
must be developed manually, and are quite labor-intensive Previously
developed program are classified by the nether of bends and/or by the
directions of the bends. Engineers examine each part style to determine
if previously developed and classified programs may be used or whether a
new program must he written. However, since each classified program
typically supports only a narrow range of acceptable part dimensions, new
programs must frequently be written by the engineers. The final RML robot
program, when complete, is compiled and downgraded by the MM20-CAS system
40 to robot controller 44. The bending program is entered and debugged on
a control pendant provided on press brake controller 42. After entering
the robot and bending programs into the system, an operator performs
several manual operations to walk the system through the several
operations to be performed. For example, an operator will manually
operate a hand-held pendant of the robot controller to manually move the
robot to the loading and unloading positions, after which the interface
console 40 will store the appropriate locations into the final RML
program to be compiled and down-loaded to robot controller 44. In
addition, in producing the bending program, the operator may control the
system to follow the planned bend sequence, in order to determine the
values for the backgage position (L axis) and the die rail position (D
axis).
[0024] (d) Intelligent Manufacturing Workstations
[0025] Various proposals have been made in order to overcome many of the
drawbacks with prior systems such as the BM100 Amada bending workstation,
and research has been conducted in the area of intelligent manufacturing
workstations. Some proposed features of intelligent sheet metal bending
workstations included features such as open architecture, including open
system configurations and distributed decision making, and enhanced
computer aided design and geometric modeling systems.
[0026] A paper entitled "Intelligent Manufacturing Workstations" was
presented at the 1992 A Winter Annual Meeting regarding Knowledge-Based
Automation of Processes an Nov. 13, 1992 by David Alan Bourne; the
content of the Paper is expressly incorporated herein by reference in it
entirety. In the Paper, an intelligent manufacturing workstation is
defined as a self-contained system that takes a new design for a part and
manufactures it automatically. The process is stated to include automated
setup, part programming, control, and feedback to design.
[0027] The Paper discusses several components of an overall intelligent
manufacturing workstation, including features such as open architecture,
the use of software modules that communicate via a query-based language,
part design, operations planning, workstation coal, and geometric
modeling.
[0028] (1) Open Architecture
[0029] It has been recognized that an effective intelligent manufacturing
workstation should have open software, open controller and open mechanism
architecture. That is, a machine tool user operating such a workstation
should be able to add onto the software, the controller, and the
mechanism architectures of the workstation in order to improve their
functions.
[0030] (2) Soft-Ware Modules Using Query-Based Language
[0031] Software modules have been suggested, in the above-noted paper by
David Bourne, for use in an intelligent manufacturing workstation. Such
modules would be split along knowledge boundaries which have been defined
in industrial practice, including, e.g., tooling, operations,
programming, planning and design. The software modules would be
responsible for understanding commands and data specifications, and for
answering questions in their own area of specialty. A particular module
might be configured to request information from other modules so that it
has adequate information to solve its designated problems, to communicate
in a standard language, and to work on several problems at once. In
addition, each module would know which other module to ask far
information and provide assistance in formulating a question for the
receiving module. The general software architecture proposed in the
above-noted Paper is illustrated in FIG. 4. The proposed architecture
includes a designer 50, a bend sequence planner 52, a module 54 for
sequence planning, execution and error handling, a modeler 56, a module
58 for sensor interpretation, and modules 60, 62 for process control and
holding, and fixturing. Each of the modules for sensor interpretation 58,
process control 60, and holding and fixturing 62 are coupled to external
machine and sensor drives 64. A control subsystem 68 is formed by several
of the modules, including sequence planning, execution and error handling
module 54, modeler 56, and the modules for sensor interpretation 58,
process control 60 and holding and fixturing 62. Control subsystem 68 is
shown as being implemented within a Chimera operating system. All of the
modules may be connected to other factory systems 66, including, e.g.,
systems for scheduling, operations, and process planning.
[0032] (3) Design Tools
[0033] Experimentation has been conducted with design
tools that
constantly manage the relationship between a stock part and a final part
as it is applied to sheet metal bending, as noted in the above-referenced
Paper, and as disclosed by C. Wang in "A Parallel Designer for Sheet
Metal Parts," Mechanical Engineering Master's Report, Carnegie Mellon
(1992), the content of which is expressly incorporated herein by
reference in its entirety. The design information, which may be described
in 3D, or as a 2D flat pattern, is automatically maintained (in parallel)
with another representation of the developing part. In this way, a
connection between each of the features of the initial stock part and the
final part is maintained.
[0034] (4) The Planning System
[0035] Once the design is complete, a planner typically then produces a
plan which will later be used to execute the manufacturing process. The
plan includes several instructions regarding the sequencing of machine
operations to produce the desired part. An optimal plan will result in a
reduction of setup time, a reduction in the existence of scrap after
production of the parts, an increase in part quality, and an increase in
production rate. To promulgate such advantages, the above-noted Paper
recommends that as much specific knowledge as possible be separated from
the planner so that the planner can be easily adapted to different
machines and processes. A "query-based" planning system is thus proposed
which shifts the emphasis of the planner to asking expert questions,
rather than attempting to act as a self-contained expert.
[0036] (5) Workstation Control
[0037] The above-noted Paper proposes that the controller use an
off-the-shelf engineering UNIX workstation as the core computing
resource. The workstation may include in its back-plane an extension rack
of special-purpose boards and an additional CPU, that runs with a
real-time version of the UNIX operating system, called CHIMERA-II. See,
e.g., STEWART et al., Robotics Institute Technical Report, entitled
"CHIMERA II: A Real-Time UNIX-Compatible Multiprocessor Operating System
for Sensor Based Control Applications;" Carnegie Mellon, CMU-RI-TR-89-24
(1989), the content of which is expressly incorporated by reference
herein in its entirety.
[0038] (6) Geometric Modeling
[0039] Geometric modeling is an important component in intelligent
machining workstations. Several modelers have been experimented with
during a project in the Robotics Institute at Carnegie Mellon University.
A geometric modeler called "NOODLES" has been proposed for use as a
modeler in an intelligent manufacturing workstation. The NOODLES modeler
is discussed by GURSOZ et al., in "Boolean Set operations on non-manifold
boundary representation objects," in Computer Aided Design,
Butterworth-Heinenmann LTD., Vol. 23, No. 1, January, 1991, the content
of which expressly incorporated by reference herein in its entirety. The
NOODLES system makes far fewer assumptions about what constitutes valid
edge topologies, and thus overcomes problems with other modeling systems,
which would enter into infinite loops when the edge topology of a
geometric model would violate system assumptions.
[0040] 6. Term Definitions
[0041] For purposes of clarification, and to assist readers in an
understanding of the present invention, the following terms and acronyms
used herein are defined.
[0042] bending apparatus/bending workstation--a workstation or apparatus
for performing modern sheet metal working functions; including bend
operations.
[0043] bending sheets of malleable material--working of sheets of
malleable material, such as sheet metal, including, and not limited to,
up-action air bending, V bending; R bending, hemming, seaming, coining,
bottoming, forming, wiping, folding type bending, custom bending, and so
on.
[0044] operations plan--a sequence of operations to be performed by a part
forming apparatus in order to form a finished part from a piece of
unfinished material. In the context of bend sequence planning, an
operations plan (bend sequence plan) comprises a sequence of operations
to be performed by a bending apparatus for bending workpieces comprising
sheets of malleable material, the sequence of operations including a bend
sequence which includes all of the bends needed to form a finished-bent
workpiece
[0045] subplan--a portion of a complete operations plan. In the context of
bend sequence planning, a subplan comprises a part of the information
needed to set up and/or control a bending workstation/apparatus.
SUMMARY OF THE INVENTION
[0046] In view of the above, the present invention, through one or more of
its various aspects and/or embodiments, is thus presented to bring about
one or more objects and advantages, such as those noted below.
[0047] Generally speaking, it is an object of the present invention to
provide an intelligent bending workstation environment/system which may
be easily upgraded and integrated with additional or alternate hardware
and software modules A further object is to provide such a system which
can he used to economically produce very small batch sizes (of one or
more workpieces) with high quality, and in a short amount of time. In
addition, an abject is to provide such a system that is flexible and that
is able to accommodate new and different part styles in the design and
manufacture process. The system of the present invention is intended to
operate efficiently in large volume production, and to learn from initial
production runs in order to maximize efficiency.
[0048] An additional object of the invention is to maintain quality of the
produced parts throughout the process, and to avoid errors and collisions
during execution of the process by the bending workstation. It is a
further abject of the present invention to provide an intelligent sheet
metal bending workstation which makes small batches of sheet metal parts
from CAD descriptions. In this regard, a process planner is provided that
selects the necessary hardware (e.g., dies, punches, grippers, sensors)
to be utilized by the bending workstation, determines bending sequences,
and generates the necessary software to operate the bending machine.
[0049] It is a further object of the present invention to provide such an
intelligent, automated bending workstation which first generates a
process plan and then executes the generated plan using a real-time
sensor-based control method. When the process is executed, the results
thereof may be recorded for later review, so that the process may be
refined to make it more efficient, and to reduce the occurrence of errors
during execution.
[0050] An additional object of the present invention is to provide a
system which can produce a plan for bending a sheet metal workpiece, in
which the smallest number of tooling stages will be utilized to make the
part A further object is to provide a system that will efficiently and
automatically produce the plan to be utilized by the bending workstation,
set up the workstation, and execute the plan.
[0051] The present invention, therefore, is directed-to several systems,
methods and sub-components provided in connection with a system for
generating a plan which comprises a sequence of operations to be
performed by a bending apparatus for bending workpieces comprising sheets
of malleable material. The bending apparatus has a gripper for gripping a
workpiece while performing a bend, and the sequence of operation includes
a set of N bends for forming a finished workpiece from a stock sheet of
malleable material. The system includes a proposing mechanism for
proposing, for an mth operation within the sequence of operations, a
plurality of proposed operations including a plurality of proposed bends
to be performed by the apparatus. In addition, the system includes a
subplan mechanism for providing a proposed subplan that accompanies each
proposed bend, and a generating mechanism for generating a plan including
a sequence of bends from a first bend through an Nth bend, by choosing
each bend in the sequence of operations based upon the proposed bends and
the proposed subplan that accompanies each proposed bend.
[0052] The proposing mechanism may be designed so that it proposes bends
among the complete set of N bends that are still remaining, or proposes
bends among the complete set of bends that are still remaining less bends
blacked due to constraints. In addition, the proposing mechanism may
propose, for an mth operation, a repositioning of a gripper's hold an the
workpiece.
[0053] In accordance with a specific aspect of the invention, the
generated plan further includes at least part of the proposed subplans
that accompany the chosen bends. The system may further include a
mechanism for representing the mth operation as an mth level of a search
tree. The proposed subplans may include setup and control information for
the bending apparatus, and may further comprise final locations on the
workpiece at which the gripper will grip the workpiece while performing
the bends of the bend sequence. The proposed subplans may further include
ranges of locations on the workpiece at which the gripper can grip the
workpiece while performing the bends of the bend sequence. In addition,
the proposed subplans may comprise: numbers representing a predicted
number of repositionings of the gripper needed to complete the sequence
of bends, indications that the next bend in the sequence cannot be
performed unless the gripper is first repositioned, and/or locations on
the workpiece at which a repositioning gripper (i.e., a repo gripper)
will grip the workpiece while performing a repositioning operation.
Additionally, the proposed subplans nay include: tooling stages to be
utilized to perform the bends in the bend sequence, positions along a
tooling stage at which the workpiece will be loaded into the bending
apparatus in order to perform the bends, and/or motion plans for
maneuvering around tooling stages in performing the bends.
[0054] In accordance with a further aspect of the system, an estimating
device is provided for estimating a cost to be associated with each
proposed bend. In this regard, the generating mechanism may generate a
plan including a sequence of bends from a first through an Nth bend, by
choosing each bend in the sequence of operations based upon the proposed
bend, the proposed subplan that accompanies each proposed bend, and the
estimated costs associated with each proposed bend. The estimated costs
associated with an nth bend in the sequence of N bends may comprise a k
cost calculated based upon an estimated amount of time it will take the
bending apparatus to complete one or more operations of the bend. The
estimated costs associated with an nth bend in a sequence of N bends may
comprise an h cost calculated based upon an estimated total amount of
time it will take the bending apparatus to complete one or more
operations of each of the rest of the bends in the bend sequence that
follow the nth bend.
[0055] The one or more operations of the bend which will be timed in order
to calculate the k and h costs may comprise moving the workpiece from a
tooling stage location of a preceding bend to a tooling stage location of
the given bend. The one or more operations of a given bend may also
comprise installing, when setting up the bending apparatus, an additional
tooling stage needed to perform the given bend. The one or more
operations of a given bend may also comprise repositioning of the
gripper's hold on the workpiece before performing the given bend.
[0056] In accordance with a other aspect of the present invention, the
proposing mechanism and the generating mechanism collectively comprise a
bend sequence planning module, and the subplan mechanism and the
estimating mechanism collectively comprise a plurality of expert modules.
The expert modules may each operate the subplan mechanism and the
estimating mechanism when the proposing mechanism proposes a proposed
operation for performance as the mth operation within the sequence of
operations. The plurality of expert modules may comprise a holding expert
module which is capable of operating the subplan mechanism to provide a
proposed suplan, including information regarding a location on the
workpiece at which the gripper can hold the workpiece while performing
the bends of the bend sequence. The plurality of expert modules may
comprise a holding expert module which is capable of operating the
estimating mechanism to estimate a holding cost, calculated based upon
whether a gripper's hold on the workpiece is to be repositioned before
performing a given bend. In addition, the plurality of expert modules may
comprise a tooling expert module which is capable of operating the
subplan mechanism to provide a proposed tooling subplan that includes
information regarding a position along a tooling stage at which the
workpiece will be loaded into the bending apparatus in order to perform a
given bend. The tooling expert may also be capable of operating the
estimating mechanism to estimate a cost based upon an amount of time to
install, when setting up the bending apparatus, an additional tooling
stage needed to perform a given bend. The motion expert module may also
be capable of operating the estimating mechanism to estimate a cost based
upon a calculated travel time for moving the workpiece from a tooling
stage location of one bend to a tooling stage location of a next bend.
[0057] In accordance with an additional aspect of the invention, the bend
sequence planning module may be capable of querying each of the expert
modules for a subplan and estimated costs. In addition, each of the
expert modules may be capable of responding to a query by returning a
savelist to the bend sequence planning module, whereby the savelist
includes a list of names of attributes, and values respectively
corresponding to the attributes, to be saved by the bend sequence
planning module.
[0058] As a further aspect of the invention, the system includes a
prioritizing mechanism for prioritizing proposed bends in accordance with
bend heuristics determined based upon the geometry of the workpiece. The
generating mechanism may generate a plan, including a sequence of bends
from a first through an Mth bend, by choosing each bend in the sequence
of operations based upon the prioritized proposed bends and the proposed
subplan that accompanies each proposed bend. The prioritizing mechanism
may be provided with a mechanism far discounting an estimated cost of a
bend having a high priority and increasing an estimated cost for a bend
having a low priority.
[0059] In accordance with a further aspect of the invention, a determining
mechanism may be provided for determining the time needed for, and the
feasibility of, producing one or more parts with the bending apparatus
based upon the generated plan. In addition, the system may be provided
with a mechanism for performing calculations of the costs of producing a
given batch of parts, based upon the time determined by the determining
mechanism. In addition, or in the alternative, the system may he provided
with a mechanism for redesigning the part based upon the time and the
feasibility determinations made by the determining mechanism. The system
may be further provided with a mechanism for scheduling manufacturing
with the bending apparatus defending upon the determined amount of time
for producing one or more parts.
[0060] In addition to the above-described system, the present invention is
further directed to a computerized method for selecting a gripper for
holding a workpiece. The gripper is selected for use in a bending
apparatus for bending unfinished workpieces comprising sheets of
malleable material. The method includes reading information describing
the geometry of a library of grippers to be chosen from, forming a set of
available grippers excluding grippers that have certain undesired
geometric features, and choosing a gripper from a set of available
grippers. The gripper is chosen as a function of the width of the
gripper, the length of the gripper, and the knuckle height of the
gripper. The gripper may include a gripper for holding the workpiece
while loading and unloading the workpiece into and from a die space of
the bending apparatus. In this regard, the method may include a step of
predicting, for each gripper within the set of available grippers, a repo
number equal to an estimated number of times the bending apparatus will
need to change the position at which the gripper is holding the workpiece
in order to perform a complete sequence of bending operations on the
workpiece. The smallest predicted repo number is then determined, and the
set of available grippers is adjusted to include the available grippers
having a repo number equal to the smallest predicted repo number, before
choosing (from among the set of available grippers) a gripper as a
function of the gripper's width, length, and knuckle height.
[0061] The gripper may alternatively comprise a repo gripper for holding
the workpiece while a robot changes its grip an the workpiece. In this
regard, the method may be further provided with a step of constructing
data representations of the respective intermediate shapes of the
workpiece when repo operations are to be performed by the bending
apparatus, and utilizing the intermediate shapes to determine which
grippers are excluded from the set of available grippers. The grippers
that cannot securely grasp the workpiece, considering all of the
constructed intermediate shape representations, are excluded from the set
of available grippers.
[0062] In addition to the above-described system and method, the present
invention is further directed to a computerized method for determining a
location at which a gripper can hold a malleable sheet workpiece while a
bending apparatus performs an mth operation an the workpiece. The bending
apparatus performs a sequence of operations, including the mth operation,
in accordance with a bending plan. The sequence of operations includes a
sequence of bends from a first bend through an Nth bend, and the shape of
the workpiece changes to several intermediate shapes as the bending
apparatus progresses through the sequence of a bends. A set of
topographic representation is formed by repeatedly generating, along
edges of the workpiece, as a variable i is varied, a graphic
representation of areas on the workpiece within which the gripper
location can be without hindering performance of an ith operation. A
determination is made as to whether or not the performance of the ith
operation will be hindered by taking into consideration the intermediate
shape of the workpiece when the ith operation is performed. The method
further includes the step of determining the intersection of all the
geographic representations within the set to thereby determine the areas
common to the given plurality of operations in the sequence of
operations. The mth operation may include changing a robot's grip an the
workpiece between bends in the sequence of bends, and/or performing a
bend within the sequence of bends.
[0063] In addition to the above, the present invention may be directed to
a computerized method for selecting tooling to be used in a bending
apparatus for bending a workpiece comprising a sheet of malleable
material. The tooling includes at least a die and a punch, and the
bending apparatus performs, utilizing the selected tooling, a sequence of
operations comprising a sequence of bends from a first bend through an
Nth bend. The method comprises steps of reading information describing in
the geometry of dies and punches, and forming sets of feasible dies and
punches excluding dies and punches that have an insufficient force
capacity to bend the workpiece and that are incapable of forming desired
bends in the workpiece resulting in desired angles and desired inside
radii. In addition, the method includes a step of choosing an appropriate
die and appropriate punch that most closely satisfies force, bend angle,
and inside radii requirements, excluding punches that will likely collide
with the workpiece as determined by failure of a geometric collision
test.
[0064] The geometric collision test may be performed by modeling a
finished 3D workpiece and, for each bend in the sequence of bends,
aligning the modeled finished 3D workpiece between a model of each
feasible punch and a model of a chosen die.
[0065] In addition to the above, the present invention may be directed to
a computerized method for determining a layout of tooling stages along a
die rail of a bending apparatus. The bending apparatus is adapted to bend
workpieces comprising sheets of malleable material, by performing a
sequence of operations comprising a sequence of bends from a first bend
through an Nth bend. The method includes a step of deciding on an
arrangement of a plurality of stages along the die rail and calculating
lateral limits based upon the amount by which the workpiece extends
beyond a side edge of a tooling stage for the bends of the sequence of
bends. In addition, the method includes determining a largest lateral
limit for each side of the stage, and spacing adjacently arranged stages
to have a gap between adjacent side edges that is greater than or equal
to the larger of the determined largest lateral limits of the adjacent
side edges.
[0066] In addition to the above-described system and methods, the present
invention may be directed to a system far generating a plan and for
controlling a bending apparatus. As described above, the plan comprises a
sequence of operations to be performed by the bending apparatus, and the
bending apparatus is adapted to bend workpieces comprising sheets of
malleable material. The sequence of operations includes a sequence of
bends, from a first through an Nth bend, for forming a finished workpiece
from a stock sheet of malleable material. The system includes a setup
planning mechanism for generating the sequence of bends and a setup
subplan that includes information regarding the manner in which the
bending apparatus is to be set up before commencing the first bend in the
sequence of bends. In addition, the system includes a forwarding
mechanism for forwarding the setup subplan, once generated, to a
signalling device for signalling commencement of setup operations to be
performed in accordance with the setup subplan. A finalize mechanism is
further provided for generating detailed subplan information to complete
the plan after the setup subplan has been generated. At least part of the
detailed subplan information is generated after the commencement of setup
operations has been signalled by the signalling device. The setup subplan
may include one or more of the following types of information:
information regarding the layout of tooling stages; information regarding
tooling die and punch profiles to be utilized in the bending apparatus;
positions of tooling stages along a die rail of the bending apparatus;
information regarding what type of gripper to use for manipulating the
workpiece through the bend sequence; and information regarding what type
of rep gripper to use for holding the workpiece while a gripper changes
its grasp on the workpiece in between bends of the bend sequence.
[0067] The forwarding device may include a device for forwarding
instructions to a sequencer module which directs performance of automated
setup operations on the bending apparatus. In addition, or in the
alternative, the forwarding device may also, or in the alternative,
create a visual representation of setup operations to be performed an the
bending apparatus so that a human operator can thereby perform the setup
operations.
[0068] In addition to the above-described systems and methods, the present
invention may be directed to a system for performing setup operations an
a bending apparatus so that the bending apparatus can be utilized to
perform bending operations an workpieces comprising sheets of malleable
material. The bending apparatus includes a die, a tool punch holding
mechanism, and one or more tooling stages. Each tooling stage includes a
die mounted on the die rail and a tool punch held by the punch holding
mechanism. The system further includes a mechanism for receiving
information regarding a location of each of the one or more tooling
stages along the die rail, and a control mechanism for controlling a
position of a guide member along at least one of a die rail and the tool
punch holding mechanism based upon the received information so that at
least one of the die and the tool punch can be aligned with reference to
the guide member and so that the resulting tooling stage will be at a
desired location along the die rail.
[0069] The control mechanism may be capable of positioning the guide
member to be at a specified position along the die rail and to be within
a certain distance from the die rail, whereby a die of a tooling stage to
be aligned can be abutted against the guide member in order to properly
position the tooling stage along the die rail. The guide member may
include a backgage finger of a mechanism for performing backgaging when
loading a workpiece into the bending apparatus.
[0070] In addition to the above-described systems and methods, the present
invention may be directed to a system for executing a plan for
controlling a bending apparatus for bending workpieces comprising sheets
of malleable material. The plan includes a sequence of operations to be
performed by the bending apparatus. A sensor-based control mechanism is
provided for performing an operation, including moving a workpiece from
one position to another, with the bending apparatus utilizing a sensor
output to modify the movements of the workpiece. A measuring device
measures an amount by which the movement of the workpiece was modified
due to the sensor output, and a learned control mechanism performs, the
operation, including moving the workpiece from one position to another,
without modifying the movement of the workpiece utilizing a sensor
output. The learned control mechanism controls performance of the
operation based upon the amount measured by the measuring device.
[0071] The above-listed and other objects, features, and advantages of the
present invention will be more fully set forth hereinafter.
BRIEF DESCRIPTION OF THE DRAWINGS
[0072] The present invention is further described in the detailed
description which follows, by reference to the noted plurality of
drawings by way of non-limiting examples of illustrative embodiments of
the present invention, in which like reference numerals represent similar
parts throughout the several views of the drawings, and wherein:
[0073] FIG. 1 illustrates a prior art bending workstation;
[0074] FIG. 2 illustrates part of a side view of a prior art bend press;
[0075] FIG. 3 illustrates a partial front view of a prior art bend press;
[0076] FIG. 4 illustrates a prior art bend planning and control system;
[0077] FIG. 5A illustrates a bend planning and control system provided in
accordance with an illustrated embodiment of the present invention;
[0078] FIG. 5B illustrates a stage setup controlling system;
[0079] FIG. 5C illustrates a top view of a die rail with a stage setup
operation being performed thereon;
[0080] FIG. 6 illustrates a bend planing and control system with a
detailed diagram of control system 75 as illustrated in FIG. 5A;
[0081] FIG. 7 illustrates a high level flow chart of an overall planning
process to be performed by the illustrated planning system;
[0082] FIG. 8 illustrates a flat workpiece provided for purposes of
describing labeled geometric bend-related features;
[0083] FIG. 9 illustrates a flat workpiece and a corresponding search
tree;
[0084] FIG. 10 illustrates a thickness transformation of a single
workpiece;
[0085] FIG. 11 illustrates a thickness transformation of an assembly of
workpieces;
[0086] FIG. 12 illustrates a geometric modeling file structure with and
without a thickness transformation;
[0087] FIG. 13A illustrates a plurality of functions of a design system
for intelligent bend planning;
[0088] FIG. 13B illustrates a part modeler for modeling parts based upon a
design system's output shape file;
[0089] FIG. 13C and FIG. 13D respectively illustrate a 2D representation
and a 3D representation of a workpiece;
[0090] FIGS. 14A-14E illustrate an example graphic user interface of the
CAD system provided in the illustrated embodiment, and the steps of
designing a part utilizing such a graphic interface;
[0091] FIG. 15A illustrates a side view of a bent workpiece with
thickness;
[0092] FIG. 15B illustrates a top view of an undeveloped flat 2D workpiece
representation;
[0093] FIG. 15C illustrates a top view of a developed flat 2D workpiece
representation;
[0094] FIG. 16 illustrates a 2D drawing corresponding to a bend graph
listing;
[0095] FIG. 17A illustrates a BM100 geometric modeling filing structure;
[0096] FIG. 17B illustrates a tooling modeling file structure;
[0097] FIG. 18A illustrates a gripper modeling file structure;
[0098] FIG. 18B illustrates a part modeling file structure;
[0099] FIG. 19 illustrates an FEL planning message to be sent from a bend
sequence planner to a motion expert;
[0100] FIG. 20A presents an example of a workpiece and a search tree
generated in accordance with the workpiece;
[0101] FIG. 20B illustrates an example workpiece and search tree with bend
twin nodes;
[0102] FIG. 20C illustrates an example workpiece and search tree with a
constrained bend twin node;
[0103] FIGS. 20D and 20E illustrate: example workpieces with co-linear
bends;
[0104] FIG. 21 illustrates a general example flow chart of A* applied to
sheet metal bending;
[0105] FIGS. 22A-22D illustrate the main flow of an embodiment of the bend
sequence planner illustrated herein;
[0106] FIGS. 23A-22D illustrate a process for performing subplanning and
cost assignment;
[0107] FIG. 24 illustrates an example workpiece and search tree, with
calculated costs illustrated;
[0108] FIG. 25A is an example workpiece having an inner tab;
[0109] FIG. 25B is an example workpiece with outer and inner bend lines;
[0110] FIG. 25C is an example workpiece with short and long bend lines;
[0111] FIG. 25D is an example portion of a bent workpiece, with abutting
inside and outside corner edges;
[0112] FIG. 25E represents an example cutaway portion of a workpiece with
co-linear bends;
[0113] FIGS. 26A, 26B, 27A-27C show example workpieces used to explain
constraint expressions;
[0114] FIG. 28 comprises a graph comparing the histories of nodes b6' and
b6;
[0115] FIG. 29 comprises a chart of a dialogue between the bend sequence
planner and the holding expert;
[0116] FIG. 30 illustrates a chart of a dialogue between the bend sequence
planner and the tooling expert;
[0117] FIG. 31 illustrates a chart of a dialogue between the bend sequence
planner and the motion expert;
[0118] FIG. 32 illustrates a process of the selection of a robot gripper;
[0119] FIG. 33A illustrates a flat 2D workpiece with discretized x points
illustrated thereon;
[0120] FIG. 33B illustrates a bent 3D workpiece with discretized x points
placed thereon;
[0121] FIGS. 34A-34B illustrate a process for predicting a minimum number
of repos to be performed before the search;
[0122] FIGS. 35A-35B illustrate a process for predicting a minimum number
of repos to be performed during the search;
[0123] FIGS. 36A-36B illustrate a process for determining the robot's
grasp locations an the workpiece;
[0124] FIG. 37 illustrates a 2D workpiece having both sheet and edge
coordinate systems;
[0125] FIG. 38 illustrates a 2D workpiece and the illustrated generation
of available Y grasp locations;
[0126] FIG. 39 is a diagram representing the intersections grasp regions
to determine of a final grasp region before a repo is performed;
[0127] FIG. 40 comprises examples of grasp regions in different levels of
the search;
[0128] FIG. 41 illustrates a process for determining the repo gripper
location;
[0129] FIG. 42 illustrates a process for selecting a repo gripper before
performance of a state-space search;
[0130] FIGS. 43A-43B illustrate a process for selecting a repo gripper to
be performed after a state-space search;
[0131] FIG. 44 illustrates a bin-packing process to be performed before a
search;
[0132] FIG. 45 illustrates a graphic representation of the steps utilized
to determine an initial tooling h-cost (based upon the total predicted
stages which will be needed to perform the complete bend sequence);
[0133] FIG. 46 illustrates the steps of a process for determining the
initial tooling h-costs;
[0134] FIG. 47A illustrates a process of selecting tooling to be used;
[0135] FIGS. 47B-47C illustrate a process for performing stage planning,
[0136] FIGS. 48A-48C are graphic representations of a modeled bend press
and workpiece which will be utilized during stage planning;
[0137] FIG. 49 illustrates a process of fine motion planning;
[0138] FIG. 50 illustrates process steps performed by the motion expert to
calculate k and h costs;
[0139] FIG. 51 is a graphic representation of models of a bend press, a
robot, and a workpiece, the models being used for determining a gross
motion plan;
[0140] FIG. 52 is a black diagram which illustrates the structure of the
controller software of the planning system illustrated herein;
[0141] FIG. 53 illustrates the main process steps of the sequencer task
provided within the sequence of the planning system illustrated herein;
[0142] FIG. 54 illustrates the steps performed in executing a bend in
accordance with a developed plan;
[0143] FIG. 55 illustrates a robot task which forms part of the control
system;
[0144] FIG. 56 illustrates a press and loader/unloader (L/UL) task of the
control system;
[0145] FIG. 57 illustrates a backgage task of the control system; and
[0146] FIG. 58 is a flow chart demonstrating the main steps performed in a
learning process that may be performed by the planning system illustrated
herein.
BRIEF DESCRIPTION OF THE APPENDICES
[0147] The present invention is further exemplified by a plurality of
listings which are provided in the Appendices, wherein:
[0148] Appendix A is an output shape file produced by a CAD system which
includes a geometric/topological data structure of a workpiece as
illustrated in FIG. 14E;
[0149] Appendix B comprises an example bend graph listing formed from the
geometric/topological data structure provided in the listing of Appendix
A;
[0150] Appendix C is an exemplary listing representing the FEL messages
that may be generated and forwarded between the bend sequence planner and
various experts during the planning process; and
[0151] Appendix D is an example specification for a listing which
represents the final plan in FEL which is forwarded from bend sequence
planner to the sequencer of the planning and control system 71
illustrated herein
DETAILED DESCRIPTION OF THE ILLUSTRATED EMBODIMENTS
[0152] 1. Planning, Setup and Control
[0153] Referring now to the Figures in greater detail, FIG. 5 illustrates
a block diagram of an embodiment of a planning and control system 70 for
an intelligent manufacturing bending workstation. In the illustrated
embodiment, planning and control system 70 includes a CAD system 74, a
bend sequence planner 72, a plurality of experts (sub-planners), and a
sequencer 76. Planning and Control System 70 is connected to hardware and
sensors 78 via an interface 77.
[0154] The experts include a tooling expert go, a holding expert 82 and a
motion expert 84. Additional experts may be 30, provided, such as sensing
expert 85 illustrated in dotted lines. Bend sequence planner 72, experts
80, 82, and 84, and CAD system 74 may be implemented within a
UNIX-compatible environment on a workstation computer such as a Sparc 10
Sun OS v.4.1.3. Sequencer 76 may be implemented within an additional CPU
coupled to the Sun workstation via a bus adaptor. The bus adaptor may
comprise a BIT 3 VME-to-VME bus adaptor which extends between the Sun
workstation and a revote VME bus passive back-plane. The passive
back-plane may hold several interface mechanisms such as VME (Virtual
Memory Extension) boards, which together form part of interface 77 as
illustrated in FIG. 5. Sequencer 76 may be implemented within a real-time
UNIX-compatible multiprocessor operating system such as C and may be run
by the additional CF which is provided in the computer workstation's
back-plane. Accordingly, in the illustrated embodiment (shown in FIG. 5),
CAD system 74, bend sequence planner 72, experts 80, 82, 84 (and 85) and
sequencer 76 are each implemented primarily with software which controls
the operations of a computer utilizing a UNIX-compatible operating
system. Sequencer 76 is implemented within a real-time UNIX-compatible
multiprocessor operating system such as CHIMERA.
[0155] CAD system 74 is utilized to design a sheet metal configuration, by
defining the shape of a stock (flat) sheet metal part and the bends to be
performed on the stock part to form a desired three-dimensional finished
part. In designing the sheet metal part, CAD system 74 forms one or more
information files which describe the part. As a three-dimensional part is
designed, in a preferred embodiment, the CAD system maintains in memory,
and visually, a three-dimensional representation of the sheet metal part
in parallel with a two-dimensional representation of the part. The
designer may modify the design by adding or removing details to or from
either representation CAD system 74 may also perform functions such as
gathering and/or generating information needed for geometric modeling and
requesting advice from bend sequence planner 72 as to whether certain
design features (an be implemented by the bending workstations
[0156] Bend sequence planner 72 operates in cooperation with tooling
expert 80, holding expert 82, motion expert 84, and any other experts
(e.g., sensing expert 85) to produce a plan for complete part production
by a bending workstation of the part designed with the use of CAD system
74. Bend sequence planner 72 performs functions such as proposing a
particular bend in a hypothetical bend sequence, and determining what
initial steps must be performed by the system in order to execute such a
bend having a position within the hypothetical bend sequence. In
determining the consequences of the proposed bend, bend sequence planner
72 may query tooling expert 80 as to what tooling would be needed to
execute the proposed bend, querying holding expert 82 as to how the
workpiece can be held while performing the proposed bend, and querying
the motion expert 84 as to whether and to what extant the robot (which is
holding the workpiece) can be manipulated to assist in making the bend.
If a sensing expert 85 is provided, bend sequence planner 72 might query
sensing expert 85 as to whether a particular sensor-based control
strategy is needed in order to facilitate the execution of the proposed
bend by the workstation and the costs associated with a particular
sensor-based control strategy. Bend sequence planner 72 may be configured
to continually propose bends from a first bend consecutively to a last
bend in a complete bend sequence, thus resulting in a complete set of
bends to perform the final workpiece. Once the successful final bend
sequence has been generated in this manner, bend sequence planner 72 may
be configured to generate a final plan (which includes a general list of
steps and accompanying information needed to control execution of the
various hardware elements of the workstation), and forward the plan to
sequencer 76.
[0157] Sequencer 76 directs execution of the plan developed by bend
sequence planner 72. Sequencer 76 interprets commands given by bend
sequence planner 72 in the resulting plan, and controls timing of the
various commands by parsing the commands and information accompanying the
commands and placing them into queues provided for each of the main
hardware elements of the sheet metal bending workstation.
[0158] Controller 75 comprises a plurality of tasks which correspond to
the various hardware elements of the workstation. Each task is activated
by the sequencer in an appropriate manner in accordance with the plan
forwarded by the planner.
[0159] (a) The Planning System Operations: Planner and Sub-Planners
[0160] Bend sequence planner 72, and the several sub-planners including,
e.g., tooling expert 80, holding expert 82 and motion expert 84, (and
sensing expert 35), form a planning system 71.
[0161] Bend sequence planner 72 analyzes the designed part (Sheet metal
workpiece), provided by CAD system 74, and offers a bend sequence to be
performed by the bending workstation. Planner 72 utilizes a state-space
search method in order to determine an efficient sequence of bend
operations that can be utilized by the bending workstation. Planner 72
converses with tooling expert 80, holding expert 82 and motion expert 84
in order to obtain the information it needs to make its decisions.
[0162] Tooling expert 80 responds to queries made by planner 72, and
provides information to the bend sequence planner such as which tools
will be needed for a particular bend operation or bend sequence. In
addition, tooling expert 80 may inform bend sequence planner 72 of the
arrangement of
tools within the workstation. Tooling expert, in
conjunction with planner 72, will attempt to design a setup of tooling so
that the fewest number of stages/toolings are utilized to make a
particular part, i.e., to execute a complete bend sequence for making the
part.
[0163] Holding expert 82 makes holding-related determinations, such as,
e.g., whether the robot can hold the workpiece while a particular bend,
specified by bend sequence planner 72, is being performed. Holding expert
82 may also determine the location at which the robot should hold the
workpiece so that the workpiece may be maneuvered through a series of
bends, without collision, and without the need to change the robot's
grasp on the workpiece. In addition, holding expert 82 may determine the
position at which the repositioning gripper should hold the workpiece
when the robot's grasp is being changed, and where suction cups 31 of
loader/unloader (L/UL) 30 should be placed during unloading and loading
of the workpiece.
[0164] Motion expert 84 is responsible for generating a motion plan, i.e.,
the manner in which the robot should be maneuvered in order to move the
workpiece through various spaces and along various routes as needed to
execute the bends.
[0165] Bend sequence planner 72 and the respective experts may be modular
to communicate with each other in a query-based manner. For example,
before deciding to include a particular bend as part of the bend
sequence, bend sequence planner 72 may query tooling expert 80 as to
whether there are sufficient tools to handle the bend. Bend sequence
planner 72 will then await a response from tooling expert 80. Tooling
expert 80 will recognize the query from bend sequence planner 72, and
will return with a response, e.g., indicating that there are sufficient
tools to handle that particular bend noted by bend sequence planner 72.
By way of example, bend sequence planner 72 may, also ask holding expert
82 if robot arm gripper 14 can remain holding onto the workpiece during a
particular bend operation without repositioning its grasp of the
workpiece. Holding expert 82 will then respond to the query made by bend
sequence planner 72, and bend sequence planner 72 will then utilize the
information to perform its next determination.
[0166] Each of the modules of planning system 71 utilizes one or more
functions provided by a geometric modeling library (not shown) in order
to model the relative interactions and positions of each of the hardware
components of the system as may be needed in making their determinations.
[0167] (b) System Setup
[0168] Once a plan is generated by the planning system, the system will
perform a setup process. The setup process can be performed completely
manually, or it may be automated in full or in part with the use of
automated tool changers. The manual activities to be performed during the
setup process may include downloading program data to dedicated
controllers such as those illustrated in FIG. 1.
[0169] As shown in FIG. 5D, each stage (stage 1 and stage 2 as illustrated
in FIG. 5D) must be set up by placing a plurality of die segments 810a,
810b, and 310c in stage 1, and 811a, *811b, and 811c for stage 2 along
die rail 22. In order to gauge the location at which die segments for
each stage will be placed, a human operator will typically measure the
distance from the edge of the die rail 22 to a particular edge of the die
corresponding to each stage. For sample, a measurement may be made from
the left edge of die rail 22 to the left edge of each die set for each
stage in order to position the die segments corresponding to each stage.
Pursuant to a particular embodiment of the present invention, a mechanism
may be provided for automatically providing a guide that can be used by
the setup operator to place the die segments at the appropriate location
along die rail 22. Such a mechanism may comprise a backgage finger 88
which can be automatically positioned at a particular edge of each stage
along die rail 22. For example, backgage finger 83 may be first located
at location A for purposes of abutting first die segment 810a against
backgage finger 88, and subsequent installment of second and third die
segments 810b and 810c. After aligning die segments for stage 1, backgage
finger 88 may be automatically positioned to the next stage, i.e., stage
2. More particularly, backgage finger 88 may be positioned at one side of
the die corresponding to stage 2. In the illustrated example, backgage
finger 88 is positioned at the left edge of die 811. While backgage
finger 88 is at that position, first die segment 811a may be placed along
die rail 22 and abutted against backgage finger 88 for alignment.
Thereafter, die segments 811b and 817c may be placed on and secured to
die rail 22.
[0170] FIG. 5c illustrates the main components for controlling the
backgage finger 88 to assist in positioning an alignment of dies 810 and
811. The subsystem comprises an input control module 87a which includes a
mechanism for instructing backgage servo controller 87b to move backgage
finger 88 to one or more particular stage locations.
[0171] According to FIG. 5A, alignment control module 87a may be provided
in control portion 75 of planning and control system 70a while backgage
servo controller 87b may be provided with an interface 77. More
specifically, controller 75 may be provided with a backgage task module.
The backgage task module may be provided with a backgage finger
die-alignment function which may be, called by the backgage task module.
In calling the die-alignment function, the backgage task module may
activate and control a backgage servo controller through the use of a
second level backgage device driver 206 (see FIG. 6), which in turn
interacts with an appropriate level 1 device driver such as an I/O device
driver 220 which interacts with a parallel I/O card connected to the
backgage hardware of the bending workstation.
[0172] Another manual step that can be performed is positioning and/or
adjusting of the punch holders 20. In addition, standard steps may be
performed to align tool punch segments so that they are properly seated
within each punch bolder 20 and correspond to the associated die segments
is may comprise operating the press so that the die segments and
corresponding tool punch segments are-compressed against each other with
a set amount of force. In addition, other standard adjustments and
procedures, known to those skilled in the art, may be performed during
setup. For example, loader/unloader 30 may need to be adjusted so that
suction cups 31 are properly positioned with respect to the workpiece 16.
[0173] Workstation 10 may be configured to be controlled automatically by
the planning system, without any need for human intervention. In the
event that certain control modules are still maintained as separate,
e.g., separate robot control module 44 as shown in FIG. 1, along with
separate press brake controller 42 and load/unload controller 46, the
planning system may be configured to download appropriate components of
the plan to the appropriate control modules.
[0174] (c) Sequencing and Control
[0175] In the illustrated embodiment, sequencer 76 is implemented within a
real-time UNIX-compatible shell such as an Ironics IV-3230 computer with
a CHIMERA II operating system. Additional information regarding possible
implementations of a real-time scheduler such as sequencer 76 is provided
in the CHIMERA manual by Stewart, Schmitz and Khosla, entitled "CHIMERA
II Real-Time programming Environment, Version 1.02" (Oct. 29, 1990), the
content of which is incorporated by reference herein in its entirety.
Sequencer 76 schedules the general execution ol the generated plan by
control system 75, which utilizes interface architecture 77 to
communicate with various hardware elements and sensors within the system,
depicted as hardware and sensors 78 in FIG. 5.
[0176] FIG. 6 depicts in greater detail, sequencer 76, control system 75,
and interface architecture 77. As illustrated in FIG. 6, sequencer 76 is
connected to bend sequencer planner 72 and is further connected to a
plurality of modules which comprise control system 75. The modules of
control system 75 include a robot task 92, a press and L/UL task 94, a
backgage task 96, a motion library 98, a speed control module 102 and a
collision detection module 100. Interface architecture 77 comprises a set
of level 2 device drivers and another set of level 1 device drivers. The
level 2 device drivers (DD's) may include robot DD 202, press and L/UL DD
204, backgage DD 206, gripper DD 208, gripper sensor DD 210, drop sensor
DD 212, backgage sensor DD 214, and angle sensor DD 216. The level 1
device drivers may include respective device drivers 220, 222 and 224 for
one or more parallel I/O VME cards, one or more A/D VME converter cards,
and a robot servo control card.
[0177] Accordingly, as illustrated by interface architecture 77, a
two-level device driver format is recommended for interfacing the various
tasks and control modules of control system 75 to the various hardware
elements of the bending workstation. The first level device drivers
comprise a UNIX-like interface, with commands supported including open (
), close ( ), read ( ), write ( ), ioctl ( ), and mnap ( ) commands. The
first level device drivers standardize the interface to the I/O ports to
which the hardware devices are attached, such as parallel I/O ports,
analog/digital converters and a robot servo control mechanism. The second
level device drivers form an interface between the various modules of the
control system 75 and the first level device driver. Although there is no
standard interlace routines provided for the second level device drivers,
the second level device drivers may be implemented with the use of a
standard farm as disclosed in the above-noted CHIMERA manual. With the
use of a two-level device driver format, a software interface system may
be provided which is reliable, portable, and has code which is easily
readable. Specific details regarding the device drivers, and examples
implementations thereof, are provided in the above-noted CHIMERA manual,
which has been incorporated by reference herein.
[0178] As to the VME cards which are the actual I/O parts connecting the
computer to the hardware elements, such cards may include, as noted
above, one or more parallel I/O cards, such cards preferably having
optically isolated connections between the commuter and the various
hardware elements connected thereto. In addition, the VME cards may
include one or more Geonics motion two axis servo control cards II MCCII
and one or more A/D converters having sufficient a number of channels and
bit resolution, e.g., an A/D converter with 16 channels and 12 bit
resolution, such as the IXV-1645 Ironics (Pentland-Burr-Brown MV 950S).
The parallel I/C cards may include an 80-channel (with 64 usable
channels) Xycom XVME-240 card and/or 32-channel digital output boards
such as the Xycom XVME-220 and/or XVME-212 boards. One or more A/D
converters can be provided for inputting information such as reading
various data produced by the sensors included in the workstation, such as
a gripper sensor, droop sensor, backgage sensor, and/or angle sensor.
[0179] Each of the robot task 92, press and L/UL task 94, and backgage
task 96, control the appropriate device drivers for controlling the
corresponding hardware elements of the bending work-station. Several
functions which must be performed during execution of various
motion-related functions may be provided in motion library 98. Such
functions may include kinematics, trajectory calculations and filtering.
Any control functions relating to speed control, i.e., controlling the
speed with which various physical elements (such as the robot) of the
bending workstation are moved, may be implemented within speed control
module 102. Collision detection module 100 is provided in order to
perform collision detection which is needed in certain motion control
processes during execution of the bend process.
[0180] Motion library 98 may further include dynamic motion control and
sensor-based motion control modules which directly communicate with the
second-level device drivers for dynamically controlling the movement of
various components of the bending workstation and for changing such
control in accordance with sensor-based signals produced by the various
sensors provided in this system.
[0181] It is noted that in the parallel I/O cards it is preferred that the
computer be optically isolated from the actual hardware connections to
prevent damage that may be caused by surges present at the hardware
components. Other reasons for optically isolating the parallel I/a cards
is to protect the computer and the car and to prevent the occurrence of
ground loops. However, it is not necessary that the A/D converters be
optically isolated from the sensors.
[0182] 2. Bend Sequence Planner
[0183] Bend sequence planner 72 of the embodiment shown in FIG. 5A
performs three main functions. It generates a bend sequence, including
accompanying operations associated with each bend, queries experts as to
the consequences of the bend sequence as it is generated, and as to
further plan details (subplans) needed to accomplish the generated bend
sequence, and compiles all gathered/generated information in order to
form an overall plan. The plan specifies the-steps needed to execute the
bend sequence by a control system which controls operations of the sheet
metal bending workstation. Each of the experts of the illustrated
planning system 71 performs three main functions when requested by
planner 72. They each determine an incremental cost for performing an
individual step within the bend sequence, develop proposed/intermediate
plan information, and communicate the incremental cost and plan
information to bend sequence planner 72. The proposed/intermediate plan
information includes two types of information: definite information and
indefinite information. For example, at a certain paint in time during
planning, holding expert 82 will know which regions of the workpiece may
be grasped by the robot grasper to perform a given bend within a bend
sequence (the grasp regions being definite), but will not yet know the
exact grasp location (the precise grasp location being indefinite). A
temporary (indefinite) grasp location will be assigned by the holding
expert 82, which can be verified at a later time. As noted above,
sequence planner will query each expert as to the consequences of a bend
sequence as it is generated.
[0184] The consequences of the bend sequence are represented in terms of
cost. The costs of the bend sequence as it is generated may be determined
as a function of one or more of: the amount of time that it takes to
perform a particular operation within the bend sequence, the extent to
which an operation within the bend sequence will affect the accuracy of
the operation and the quality a the resulting workpiece, whether or not
there are any safety concerns associated with performing a particular
operation at a particular point in a bend sequence, and whether there are
any heuristics which, if taken into account, would suggest performing one
operation instead of another at a particular point in the bend sequence.
[0185] Bend sequence planner 72 may query experts for information such as
what tool profile should be utilized to perform certain bends of the bend
sequence, what stage segments will be needed to farm a given stage which
will be needed to perform a bend, and where can/should the robot gripper
grasp the workpiece in performing one or more bends of the bend sequence.
In addition, planner 72 may query the experts as to when a repositioning
of the workpiece should be performed in the bend sequence, and how should
the robot and the workpiece be moved in order to execute various
operations throughout the sequence, such as a bend, repositioning,
workstation load, and/or a workstation upload. FIG. 7 represents, in a
high level flow chart, the major steps performed by an example embodiment
of bend sequence planner 72. In a first step S1, parallel design
processing is performed by CAD system 74. The parallel design processing
may comprise, among other functions, labeling various geometries
corresponding to respective portions of the workpiece, the resulting
labels being used later (in step S3) by the bend sequence planner to
determine whether heuristics should be considered in generating the bend
sequence plan. Subsequently, in step S2, a heuristics framework is
produced to guide the bend sequence planner in choosing the bends that
will form the bend sequence. In producing the heuristics framework for
the bend sequence in step S2, a partial order of bending steps is
computed that complies with certain specified heuristics. Subsequently,
in step S3 a state-space search algorithm is performed which will be
influenced by the heuristics framework. The state-space search algorithm
performs an analysis of the implications of performing various bends in a
prescribed order, by assigning costs to each bend in step S4. In order to
help with the assignment of costs, in step S5, geometric reasoning is
utilized, e.g., to determine the physical implications a Particular bend
will have by modeling the machine and the resulting workpiece as theft
relate to each other during the execution of each bend.
[0186] The heuristics are taken into account by either reducing the
assigned costs for a particular bend (if it is preferred due to
heuristics) or by increasing the assigned costs (if the bend is not
preferred due to heuristics). A particular sequence of bends is thus
developed in step S3, which can be executed to produce the desired
finished workpiece. Once the state-space search algorithm is performed in
step. S3, a determination is made in step S6 as to whether or not a
complete plan, including a complete bend sequence, has been generated. If
a plan cannot be formed for the design that has been specified, the
process returns to step S1, where the workpiece may be redesigned to form
a part design for which an operational plan can be created.
[0187] If a determination is made in step S6 that a complete plan was
produced, the process will proceed to step S7, and the complete plan will
be forwarded, using FEL, to the sequencer, or the plan may be stored in a
file for later retrieval and execution by the sequencer. The state-space
search algorithm will preferably comprise an A* algorithm, such as
disclosed, e.g., by Nils J. Nilsson in "Problem-Solving Methods in
Artificial Intelligence" McGraw-Hill Back Company, 1971, pages 43-67, the
content of which is expressly incorporated herein by reference in its
entirety.
[0188] It is noted that the cost assignment step S4 may consider variables
such as robot motion, gripping positions, the need for regripping, the
need to change the gripper, tooling positions, and the need to change the
tools sign costs are assigned for variables that will be time consuming,
sacrifice quality, and/or expose the system to high risk.
[0189] The above-described operations planning method can be termed
generative planning (since it automatically generates a bending plan),
with weak heuristics and state-space searching. In performing the method,
a human inputs the design. A heuristics framework is defined using
heuristics which are called "weak heuristics" because they comprise only
a limited set of rules. Possible bends are considered, and costs are
assigned to each considered bend. The costs assigned to the bends are
influenced by the heuristics framework by augmenting or discounting the
cost of a particular bend. A sequence of bends of the least total cost is
chosen utilizing a state-space searching algorithm.
[0190] Generative planning with weak heuristics as disclosed herein should
be contrasted with other approaches to operations planning. One such
approach includes variant planning with case-based reasoning. In variant
planning, a hand inputs a design of a new part, and the design is coded
according to an index. The index is used to lack up an old design which
best resembles the current part to be designed and the problems to be
solved A human operator edits the old plan to solve the new problems,
e.g., by editing an MM program. One of the problems noted with variant
planning is that a similar design may require different or divergent
solutions, which will not be discovered by comparison to old plans.
[0191] Another approach to operations planning is generative planning with
strong heuristics. With generative planning with strong heuristics, the
human inputs the design and several labeled features of the new part.
Heuristics are then used to determine the total ordering of bends and
machine operations, thus being called "strong heuristics." A generative
planning system with strong heuristics lacks the flexibility and
intelligence of a generative planning system with weak heuristics, and
will likely be unable to handle unorthodox problems. Such a system has no
understanding as to what heuristics work better in a particular
situation, and which heuristics should be discarded. Moreover, such a
system will be incapable of developing a plan in many cases.
[0192] (a.1) Heuristics
[0193] Sheet metal bending heuristics can be taken into account by the
bend sequence planner of the present invention. Several exemplary bend
heuristics will be described as follows. One heuristic is to bend
internal tabs early. FIG. 25A illustrates a workpiece 16 having an
internal tab 33 which is to be bent along bend line 34a. In accordance
with this heuristic, although there are other bends to be performed along
bend lines 34b, 34c, and 34d, it is preferred that the internal tab 33 be
bent along bend line 34a first.
[0194] In accordance with another heuristic, it is desired that the bends
along the outermost bend lines be performed before the bends along the
inner bend lines. For example, referring to FIG. 25B, a workpiece 16 is
shown which includes outer bend lines 35a, 35b, 35c, and 35d, along with
inner bend lines 36a, 36b, 36c, and 36d. In this illustrated example, in
accordance with the heuristic, it is desired that the outer bends
corresponding to outer bend lines 35a-35d be performed before the bends
corresponding to inner bend lines 36a-36d.
[0195] In accordance with a third heuristic, it is preferred that shorter
bends be performed before longer bends. FIG. 25C illustrates a workpiece
having shorter bends along bend lines 37a and 37b, and longer bends along
bend lines 38a and 38h. Accordingly, it is preferred that the bends along
bend lines 37a and 37b be performed before the bends along bend lines 38a
and 38b.
[0196] In accordance with a fourth heuristic, it is preferred that bends
which form an outside face, of a corner of a 3D workpiece, be performed
before the abutting inside corner fase. FIG. 25D illustrates a workpiece
16 having an outside face 39a and an inside face 39b which each abut each
other at a corner 390. If the bend corresponding to the inside face was
done first, then, when performing the bend corresponding to the outside
face 39a, the press would not be able to cause the flange to be bent
beyond its intended 90 angle. Accordingly, when the outside face springs
back, it will not be flush with the end portion of inside face 39h.
[0197] In accordance with an additional heuristic, co-linear bends are
performed simultaneously. As shown in FIG. 25E, a workpiece 16 is shown
to include two tabs 26a and 26b, which are each to be bent along bend
lines 27a, 27b, respectively. Since the bend lines 27a and 27b are
co-linear, in accordance with the heuristic, it is preferred that the
bends along those bend lines will be performed simultaneously.
[0198] The above-described heuristics are only examples of the types of
heuristics which may be taken into account by the bend sequence planner
of the present invention. A larger or smaller set of heuristics,
including all or a portion of the above-listed heuristics, may he
utilized by the bend sequence planner.
[0199] In order to recognize when certain heuristics may apply to a given
workpiece in developing the plan, a list of key features may be created
which describe various geometric features of the workpiece which can then
be utilized by the bend sequence planner in applying the heuristic rules.
A list of key features may be described with respect to the example
workpiece 16 illustrated in FIG. 8. Several features may be deduced from
workpiece 16, while it is still in its 2D state. An example of such
features may include the flange number, the width of the flange, and the
height of that flange. Referring, e.g., to flange 7, the flange number of
the flange would be 7, a value w would he assigned-to the width of that
flange, and a value h would be assigned as the height of that flange. In
addition, values may be defined which specify an angle-class, i.e., a
class of flanges which all have the same bend angle.
[0200] Additional features which may be labeled to avoid extra searching
in the search space include an indication that the part that is symmetric
around one or more axes.
[0201] FIG. 8 illustrates a workpiece 16 and a search tree 15
corresponding thereto. Workpiece 16 has an axis of symmetry Y which is
divided down the middle, running longitudinally through workpiece 16.
Accordingly, at the first level of the search, the nodes corresponding to
bends 3 and 5 have been eliminated (as indicated by the circles
surrounding these bends) because they are symmetrical with nodes 2 and 4.
There is no need to also evaluate and search through bends 3 and 5 at the
first level, since the same effective results would be obtained if the
search started with the bend corresponding to those nodes as opposed to
either of bends 2 and 4. If the first bend chosen is bend 1, at the next
level of the search, bends 2 and 4 are still symmetrical with bends 3 and
5. Thus, the nodes corresponding to bends 3 and 5 are again eliminated
due to the fact that they are symmetrical with bends 2 and 4. However, if
the node corresponding to bend 4 is the first chosen node in the
sequence, this eliminates the symmetry of workpiece 16. Thus, at the next
level of the search stemming from the node of bend 4, there are no nodes
eliminated due to symmetry.
[0202] (a.2) Constraints
[0203] Depending upon the geometric features associated with a part to be
formed, there may be bend-related operations which cannot be performed at
certain points in the operations sequence being planned. These
bend-related operations can be constrained to (or excluded from) certain
locations in the bend sequence by using a mechanism referred to as a
"constraint". A feature extraction module (not shown) may be provided to
automatically label geometric features from geometric models produced by
the design system (e.g., using data structures similar to those indicated
above), and the geometric feature labels can be used to form legal
phrases (called constraints) in an interface communication language, such
as FEL.
[0204] Constraints may be defined by using a data structure that allows a
particular arrangement of bend operations to be specified, in varying
degrees of flexibility. For example, for a four-sided part 16 as
illustrated in FIG. 26A, the following constraint statement can be used
to specify the order in which bends 1, 2, 3, and 4 are performed:
[0205] (constraints ((1 2 3 4)))
[0206] This statement signifies that the first bend must be performed
before the second, which must be performed before the third, which must
be performed before the fourth. Further, since there are no operators
included in the statement, there may not be any other bend operations
performed before, between, or after any of bends 1-4.
[0207] If the bend 2 must be performed before bend 3, but there are no
other constraints on the arrangement of the bend operations in the bend
sequence, the following constraint statement may be used:
[0208] (constraint ((*2*3*)))
[0209] The operator "*" acts as a "wild card", and allows either no bend
operations or any number of bend operations to be performed at its
location in the bend sequence, and the type of bend operations which may
be performed at its location can be among any of the remaining bend
operations not specified in the constraint statement.
[0210] Another wild card operator, "?" can also be used, and it signifies
that exactly one bend operation, among those not specified in the
constraint statement, must be performed at its location in, the bend
sequence. Thus, if precisely one bend operation must be performed before
bend 2 in the part shown in FIG. 26A, but there is no limitation an the
number or type of bend operations following bend 2 (except that they may
not include bend 2), the following constraint statement can be used:
[0211] (constraint((?2*))).
[0212] The constraint statements may also include grouping operators,
which require that certain bend operations be grouped together with no
limitation an the order of the bend operations with the grump. For
example, the following constraint statement requires that bends 2 and 3
be before bend 4 in the bend sequence, and that bends 2 and 3 be grouped
together with no bend operations therebetween:
[0213] (constraints((*{2 3}*4*))).
[0214] More than one constraint expression can be included within a
constraint statement. Far example, the following constraint statement
includes the above grouping constraint expression, as well as an
additional constraint expression which further specifies that bend 1 must
be before bend 4 without any additional limitations as to the inclusion
and arrangement of the other operations with respect to bends 1 and 4:
[0215] (constraints((*{2 3}*4*)
[0216] (*1*4*))).
[0217] There can be any number of bend operations within a group, and
groups can be nested in order to specify that there is no requirement
that a plurality of groups be in a specific order. For example, the
following expression specifies that bends 1 and 2 must be next to each
other in the bend sequence, and bends 3 and 4 must be next to each other
in the bend sequence. However, there are no other constraints as to the
inclusion and arrangement of other bend operations due to this constraint
expression.
[0218] (*{{1 2}*{3 4}}*).
[0219] Some additional example constraint expressions may include (*7)
which means that bend operation 7 must be performed as the last bend
operation in the sequence, and (*7?), which means that bend operation 7
must be performed as the second to last bend operation in the sequence.
[0220] The types of operators that can the used to define constraints may
be expanded to include boolean operators such as NOT, CR, and AND. For
example, a constraint which uses a NOT operator could be (* NOT 7), which
would mean that the seventh bend operation could not be the last
operation of the sequence.
[0221] There is virtually no limit to the types of constraints that can be
specified, and any entity in the planning system, including the various
experts as well as a human operator of the bend sequence planner, can
define constraints. A constraint manager may be provided, e.g., within
the bend sequence planner, in order to help maintain the consistency of
constraints and resolve conflicts that arise between constraints.
[0222] By way of example, the types of constraints may include constraints
for (1) channels (e.g., as shown in FIG. 26B), (2) angle bends, where the
bend line for the flange to be bent intersects and is close to a non-end
point portion of a bend line of another bend (and both of the bends are
to be performed in the same direction, e.g., they are both positive
bends) (e.g., as shown in FIG. 27A), and (3) flanges which when bent form
a corner with an outside flange and an inside abutting flange (e.g., as
shown in FIG. 27C).
[0223] The constraint expression far the channel illustrated in FIG. 26B
usually must be (*2*1*2*), even though a common heuristic prefers that
bends an outer bend lines be performed before those of inner bend lines,
which might suggest a constraint of (*3*2*1*). This conflict in
constraint expressions, if it existed, would have to be resolved in favor
of the channel constraint (*2*1*3*).
[0224] The constraint expression for the pair bends shown in FIG. 27A may
be as follows:
[0225] (*2*1*).
[0226] If the order of bends were different, i.e., if bend 1 was performed
before bend 2, the flange of bend 2 would not be bendable beyond 90
degrees, and thus could not be properly performed (since when bending
malleable materials with elastic tendencies such as sheet metal the part
must be bent slightly beyond the goal angle of the bend).
[0227] The constraint expression far the pair of bends shown in FIG. 27C
may be as follows:
[0228] (*2*1*).
[0229] The importance of complying with this constraint is explained above
with respect to FIG. 25D.
[0230] Where appropriate, a human operator of the bend sequence planner
(or another expert/subplanner of the system) may define a constraint
expression which groups all bends on each side of a part together, so
that less time will he spent by switching between sides of the part when
performing a search for a solution bend sequence. FIG. 27B shows a part
with several bends on each side of the part, where it may be appropriate
to group the bends for each side, e.g., by using the following constraint
expression:
[0231] (*{{1 2} {3 4} {5 6}}*).
[0232] Since constraints may conflict, a mechanism should be provided for
resolving conflicts. As noted above, a constraint manager may be provided
within the bend sequence planner for this purpose. A possible
prioritization scheme could simply discard or ignore constraint
expressions that have a higher assigned priority. The priority assigned
to constraint expressions could depend upon what type of constraint it
is. For example, human input constraints could be assigned the highest
priority, with machine constraints, part constraints, and optimization
constraints being assigned respective lower priorities. Accordingly,
machine constraints would have the second to highest priority, part
constraints would have the third highest priority, and optimization
constraints would have the fourth highest (i.e., the lowest) priority.
[0233] A human input constraint is a constraint input by a human operator
controlling the bend sequence planner through a human interface. A
machine constraint is a constraint dictated by limitations of the
machines and tooling (e.g., a channel constraint). A part constraint is a
constraint dictated by the features of the part (e.g., a constraint
dictated by the presence of inside and outside abutting corners).
Optimization constraints are constraints that are created in order to
speed up the search for a bend sequence (e.g., a constraint to group
bends together that are on a particular side of the part).
[0234] In order to determine if there is a conflict between constraint
expressions, an algorithm may be provided which first checks for the
presence of common operations within a given pair of constraint
expressions. If there is a common operation among the constraint
expressions, they may then be merged together in order to determine if
they conflict. For example, if (*1*2*) was merged with (*2*3*), the
resulting merged constraint expression would be (*1*2*3*). If (*1*2*) was
merged with a conflicting expression such as (*2*1*), a null would be the
result, thereby indicating that the constraint expressions conflict with
each other.
[0235] (a.3) Co-Linear (and Compatible) Bends
[0236] If two bends have bend lines that are co-linear, e.g., bends 5 and
6 in FIG. 8, and they are compatible (i.e., they have the same bend
angles, the same bend radius, and other features which allow the bends to
be performed simultaneously), it is preferred to have the bends performed
simultaneously. For this purpose, heuristics may be provided in order to
influence the search performed by the bend sequence planner so that
simultaneous bending of co-linear bends is preferred and thus mare likely
to become part of the bend sequence formed by the search. In addition, or
alternatively, constraints may be specified using constraint expressions
to require that certain compatible co-linear bends be performed
simultaneously if possible (i.e., if the constraint expression does not
conflict with a constraint expression of higher priority).
[0237] (b) The Bend Sequence Planner's State-Space Search Algorithm
[0238] In a state-space search algorithm, a solution is obtained by
applying operators to state-descriptions until an expression describing a
goal state is obtained. In performing a state-space search method, a
start node is associated with an initial state-description, and
successors of the start node are calculated using operators that are
applicable to the state-description associated with the node. By
calculating all of the successors of a node, the node is thereby
expanded.
[0239] Pointers are set up from each successor node back to its parent
node. The pointers may later be used to indicate a solution path back to
the start node, when a goal node is finally found.
[0240] The successor nodes are checked to see if they are goal nodes by
checking the associated state-descriptions corresponding to the successor
nodes to see if they describe the goal state. If a goal node has not yet
been found, the process of expanding the nodes, and setting up
corresponding pointers, continues. When a goal node is found, the
pointers are traced back to the start node to produce a solution path.
The state-description operators associated with the arcs of the path are
then assembled into a solution sequence.
[0241] The above-described steps form a state-space search algorithm.
Variations of the above-described algorithm may be defined by the order
in which the nodes are to be expanded. If the nodes are expanded in an
order in which they are generated, the search method is called a
breadth-first method. If the most recently generated nodes are expanded
first, the method is called a depth-first method. Breadth-first and
depth-first methods are blind-search algorithms, since the order in which
the nodes are expanded is unaffected by the location of the goal node.
[0242] Heuristic information, about the overall nature of the graph and
the general direction of the goal, can be utilized to modify the search
process. Such information can be used to help direct the search toward
the goal, in an attempt to expand the most promising nodes first one type
of heuristic search method is described, e.g., by Nils C. Nilsson in
"Problem-Solving Methods in Artificial Intelligence," noted previously.
[0243] Blind-search algorithms, such as breadth-first or depth-first, are
exhaustive in their approach to find a solution path to a goal node. In
application, it is often impractical and time-consuming to use such
methods, because the search will expand an excessive number of nodes
before a solution path is found. Such an exhaustive expansion of nodes
consumes more computer memory in order to store the information
associated with each node, and more time, e.g., to calculate node
expansions and points. Accordingly, efficient alternatives to
blind-search methods are preferred. Heuristics may be applied to help
focus the search, based upon special information that is available about
the problem being represented by the graph. One way to focus the search
is to reduce the number of successors of each expanded node. Another way
to focus the search is to modify the order in which the nodes are
expanded so that the search can expand outwardly to nodes that appear to
be most promising. Search algorithms which modify the ordering of
node-expansion are called ordered search algorithms. Ordered search
algorithms use an evaluation function to rank the nodes that are
candidates for expansion to determine the node which is most likely to be
an the best path to the goal node. In operation of the ordered search
algorithm an f value is determined at each node n.sub.f available for
expansion, where f is an estimate of the cost of a minimal cost path from
the start node to the goal node constrained to go through node n.sub.f.
Each succeeding node having the smallest f value is then selected in
sequence for expansion.
[0244] FIG. 20A illustrates a tree produced by an ordered-search algorithm
applied to a blank workpiece that has four sections, which are to be bent
upward to form four sides of a box, each side being represented in FIG.
20A by a corresponding number 1, 2, 3, and 4. Each numbered side of the
box corresponds to a particular bend, including bend 1, bend 2, bend 3,
and bend 4.
[0245] The blank workpiece (stock part) corresponds to start node n.sub.0
which may also be called the root node associated with the initial
state-description of the workpiece. The successors of the start node
n.sub.0 may be calculated by expanding the start node (the root node) to
form successor nodes n.sub.1, n.sub.2, n.sub.3, and n.sub.4. At this
level of the search, nodes n.sub.1-n.sub.4 correspond respectively to
bend 1, bend 2, bend 3, and bend 4
[0246] Node 1 is sanded to include successor nodes n.sub.5, n.sub.6, and
n.sub.7 which correspond respectively to bend2, bend3 and bend4, and an
additional successor node n.sub.8 which corresponds to a repositioning
(i.e., a repo) of the robot gripper's hold on the workpiece. Node 5 is
expanded to include successor nodes n.sub.9 and n.sub.10, which
correspond respectively to bend3 and bend4, and an additional successor
node n.sub.8 which corresponds to a repo. Node n.sub.8 is expanded to
have successor nodes n.sub.13 and n.sub.14 which correspond respectively
to bend4 and a repo. Node n.sub.14 is expanded to have a successor node
n.sub.14 which is the goal node, because it results in the final bend for
the workpiece.
[0247] Bend sequence planner 72 preferably is configured to perform a
best-first state-ace search in order to develop a complete bend sequence
to be performed by the bending workstation. An ordered search algorithm
utilizes an evaluation function to rank nodes that are candidates for
expansion to deter ne the node which is most likely to be on the best
path to the goal node, i.e., the node which is the best. The first node
corresponds to the flat part, e.g., as illustrated in FIG. 20A. At each
level of the search, the best node which is on an OPEN list will be
expanded, and the expanded node will be taken off OPEN. Depending an
whether or not there are constraints concerning the ordering of certain
operations, all or a portion of the expanded nodes will be placed an
OPEN. The expanded nodes which are placed an OPEN will correspond to the
remaining bend operations, minus those eliminated due to constraints.
[0248] In accordance with a particular embodiment of the present
invention, there will be twin nodes corresponding to each bend, including
a first twin node corresponding to operation of the bend while holding
the workpiece from one side of the workpiece, and a second twin node
corresponding to performing the same bend, but while holding the
workpiece from the other side of the workpiece. The expanded nodes which
are placed an OPEN may also include one node that represents a
repositioning of the robot gripper's grasp an the workpiece (i.e., a
"repo"). In accordance with a further feature of the present invention,
certain levels of the search may be constrained so that they do not
include a node for a repo. This is because it would not make sense to
perform a repo at one level of the search and again perform a repo at the
very next level. Accordingly, if a repo is performed at an immediate
parent node, then bend sequence planner 72 will constrain the placement
of a repo node on OPEN.
[0249] FIGS. 20A and 20B each illustrate a simple example workpiece 16
having two faces 262, and one bend line 260. In addition, each of FIGS.
20A and 20B includes an accompanying diagram of a node expansion from the
root node n.sub.0 to the first level of a search tree which includes two
expanded nodes. FIG. 20B shows two expanded nodes, while FIG. 20C shows
one expanded node and indicates that the other node has been constrained.
Referring to FIG. 20B, since only one bend is to be performed an
workpiece 16, only two nodes are shown. The bend may be performed in
accordance with node A, whereby bend 1 is performed with face 2 being
inserted into the die space of the bending workstation, or bend 1 may be
performed in accordance with n.sub.2, whereby bend 1 is performed with
face 1 being inserted into the die space. Referring to FIG. 20C, once
workpiece 16 is bent along bend line 260, it is apparent that face 1 will
result in a flange having a height which is too small to allow grasping
of workpiece 16 at that side of the workpiece when performing the bend.
Accordingly, in order to perform bend 1 along bend line 260, workpiece 16
must be grasped by a robot gripper from the side of workpiece 16
corresponding to face 2. In other words, bend 1 must be performed with
face 1 being inserted into the die space. Thus, the search tree
illustrated in FIG. 20C only-includes one node n.sub.1, and shows that
while the parent node n.sub.0 might normally be expanded to include a
second node, the second node has been constrained.
[0250] A node may be constrained by eliminating it from consideration as a
possible operation within the bend sequence. Such elimination of a node
may be accomplished by preventing an expansion from including thy node,
or by simply failing to place the node on the OPEN list.
[0251] FIG. 20D illustrates an example workpiece 15 having two co-linear
bends, with bend lines 1 and 2. The nodes that may be generated from this
workpiece include the following: (1,2), (1,1), (2,2 (2,1), ((12),1), and
((12),2). By convention, the holding faces are defined an each side of
the first bend line of the co-linear bend. FIG. 20E illustrates another
example workpiece 16. The holding sides for this co-linear bend (bending
at lines 1 and 2 simultaneously) are defined in the following twin nodes:
((1 2)1), ((1 2)2). Note that the bend twin holding face is face 1, even
though face 1 also extends to the other side of the bend line (i.e., even
though it extends to a position which would be behind the die space
during a bend). This is because of the convention noted above, which is
used to choose the bend twin holding face.
[0252] FIG. 21 illustrates, in a simplified flow chart, an example
embodiment of a state-search algorithm, comprising an ordered search
algorithm, based on the algorithm disclosed by Nils J. Nilsson in
"Problem-Solving Methods in Artificial Intelligence", which may be
utilized by the bend sequence planner of the present invention in order
to form a bend sequence to be utilized by a bending workstation. After
the algorithm is started, at step S10, a start node n.sub.0 is placed on
a list called OPEN, and a function value f is set equal to 0. Thereafter,
in step S12, a determination is made as to whether there is anything in
the OPEN list. If the OPEN list is empty, the process is forwarded to
step S14, and an error indication is given. If the OPEN list is not
empty, as determined at step S12, the process will proceed to step S18.
[0253] At step S18, the nodes placed within the OPEN list are checked, and
the node having the smallest f value is removed from OPEN and placed on a
CLOSED list. This node is called n.sub.i. Thereafter, in step S20, a
determination is made as to whether the node n.sub.i is a goal node. If
it is a goal node, the process is forwarded to stem 522, where a solution
path is generated by tracing back from node n.sub.i, through its pointer
and the pointers of the previous nodes, to the start node n.sub.0.
However, if node n.sub.i is not the goal node, as determined at step S20,
the process will be forwarded to step S24. In step S24, node n.sub.i is
expanded to generate all of its successor nodes, called n.sub.j. If there
are no successors nodes n.sub.j, the process will return to step S12. For
each successor node n.sub.j that is generated, a computation will be made
for a corresponding f value f(n.sub.j)=k'(n.sub.j)+h(n.sub.j), where k'
is equal to the sum of the k costs of performing each node from the
starting node to the current node, and h is equal to the projected cost
from the current node to the goal node. Also, in step S24, each of the
computed f values will be associated with their corresponding successor
nodes n.sub.j that are not already on either the OPEN or CLOSED lists.
Such successor nodes n.sub.j are then placed an the OPEN list, and
pointers are directed from those successor nodes n.sub.j back to n.sub.i.
For each successor node n.sub.j that was already on an OPEN or CLOSED
list, an f value is associated with that successor node n.sub.j that is
equal to the smaller of the f value just computed for that node node and
the f value already associated with that node. The successor nodes
n.sub.f on the CLOSED list who have their associated f values made
smaller are placed on the OPEN list, and the pointers for those successor
nodes n.sub.j are redirected to n.sub.f. After execution of step 24, the
process will return to step S12.
[0254] (c) Illustrated Example Bend Sequence Planner
[0255] FIGS. 22A-22C illustrate a particular example embodiment of a bend
sequence planning process to be performed by bend sequence planner 72
illustrated in FIG. 5A. The bend sequence planning process is started
upon receipt of a command to commence operation, e.g. as indicated in
Step S26, by proceeding on receipt of an FEL command to start planning.
Once the process starts, and proceeds in step S28, one or more files
corresponding to the parts to be produced are read by the bend sequence
planner. Such files may be in he forms of a shape file including
information such as geometric and topological information (a 3D data
description of the part and a parallel 2D data description of the part
corresponding to 3D data description) labeled geometric features which
are pertinent to determinations to be made by bend sequence planner and a
bend graph correlating bends to be performed with geometric and
topological information.
[0256] Once the part file has been read in step S28, the process proceeds
the steps S30, S32, and S34, during which each expert is initialized.
More particularly, the holding expert, the tooling expert and the motion
expert are each initialized. Once the various experts have been
initialized, in step S36, a list of bends is built, and calculations are
performed regarding the various features of the parts. For example, a
computation may be performed regarding what the lengths of bends are and
which bends are co-linear. Thereafter, in step S38, an A* algorithm is
initiated, including steps such as putting a root node r on an OPEN list,
and setting an f value equal to 0. A determination is then made at step
S40 as to whether the OPEN list is empty. If the list is empty, the
process will proceed to step S42, and exit with an error indication.
Otherwise, if the OPEN list is not empty, the process will proceed to
step S44, in which the node on the OPEN list with the smallest f value
will be taken and placed on a CLOSED list. The chosen node will be called
n.sub.i for purposes of explaining the steps of the flow charts of FIG.
22A-FIG. 22D.
[0257] In step S46, a determination is made as to whether node n.sub.i is
a goal node. If node n.sub.i is a goal node, the process proceeds to step
S48, where a solution path is generated. Otherwise, if n.sub.i is not a
goal node, the process proceeds to step S50 which is shown at the top of
FIG. 22C.
[0258] After generating a solution path in step S48, the process will
proceed to step S56 which is shown at the top of FIG. 22D. In step S56, a
finalize message is sent along with the bend sequence to each of the
experts and each of the experts is queried for final detailed information
which is needed to complete the bend sequence plan. Thereafter, in step
S58, the bend sequence planner will await a response from the tooling
expert. Once all the final information has been received from the tooling
expert, in step S60, the setup of the bending workstation will be
started. In the meantime, while the setup of the workstation is being
performed, in step 362, the process will await a response from the motion
expert and the holding expert. Once the complete motion expert and
holding expert plans have been received, at step S64, the final plan will
be forwarded to the sequencer of the system.
[0259] Assuming that n.sub.i is not determined in step S46 to be the goal
node, the process will continue at step S50 at the top of FIG. 22C. At
this step, node n.sub.i will be expanded to obtain its successor nodes
n.sub.j. The successor rides will include bend twin nodes for each bend,
i.e., two nodes corresponding to each bend, and an additional node for a
repo, minus any nodes which are constrained from being successor nodes at
the present level of the search.
[0260] Once the successor nodes have been generated in step S50, a
subplanning and cost assignment process is performed in step S52.
Thereafter, in step S54, successors n.sub.j are each placed on the OPEN
list, with the subplan information and cost information corresponding to
each node being associated with each node in the OPEN list (e.g., by
using pointers). The process will then return to step S40 where a
determination will be made as to whether the OPEN list is empty. If the
OPEN list is empty, the process will exit with an error indication at
step S42; otherwise the process will proceed to again execute steps S44,
S46, S48, S50, 552 and S54.
[0261] FIGS. 23A-23D illustrate the subplanning and cost assignment
process which corresponds to step S52 in the bending sequence planning
process illustrated in FIGS. 22A-22D. The subplanning and cost assignment
process determines or formulates a subplan and incremental costs which
correspond to each of the expanded/successor nodes n.sub.j which have not
been eliminated as a viable node at the present level of the search due
to constraints. For each such expanded/successor node, the process
illustrated in FIGS. 23A-23D will be performed. In a first step S66, a
test will be performed for the permutability of node n.sub.j regarding
the subplan and costs of the holding expert. More particularly, a test
will be performed to determine whether the subplan and costs which will
be determined by the holding expert will be the same as that already
determined for another "equivalent" node if such is the case, the subplan
and costs will be identical to that "equivalent" node, and it is
unnecessary to again query the holding expert for such information which
would result in an unneeded use of time. If it is determined at step S68
that an equivalent node was found, then the process proceeds to step S70,
where the subplan and costs are copied and associated with that successor
node n. However, if an equivalent node is not found in step S63, the
process proceeds to step S72, where the bend sequence planner will query
the holding expert for a proposed subplan, the incremental k cost, and
the incremental h cost. In performing step S72, as soon as a cost of
infinity has been evaluated by the holding expert, the present successor
node n.sub.j will be aborted. Thus, the successor node n.sub.j will be
discarded at the present level of the search, and the subplanning and
cost assignment process will again start with the next available
successor node n.sub.j.
[0262] Once the subplan and costs have been obtained either by step S70 or
step S72, the process will proceed to step S76 (at the top of FIG. 23B),
where another test far permutability will be performed regarding the
tooling expert subplan and costs. If an equivalent node is found, as
determined at step S78, the bend sequence planner will copy the subplan
and costs corresponding to the equivalent node and associate the same
with the present successor node n.sub.j. In the alternative, if an
equivalent node is not found, the process will proceed to step S82 where
the tooling expert will be queried for a proposed subplan, a k cost and
an h cost. If a cost of infinity is evaluated, the present successor node
will be aborted at step S84. Once the proposed subplan and costs have
been determined, the process will proceed to step S36, where the bend
sequence planner will await the results from the holding expert and the
tooling exert. The process will wait far the results of the holding
expert and tooling expert queries, since such information is needed by
the motion expert to do its subplanning and cost assignment computations.
[0263] In step S88, a test will be performed for the permutability
regarding the motion expert subplan and costs. That is, a test will be
performed to determine if the subplan and costs that would be assigned by
the motion expert are identical to those which have already been assigned
to another node, the other node thereby being deemed an "equivalent" node
to the present successor node n.sub.j being evaluated. If, at step S90,
it is determined that an equivalent node has been found, the process will
proceed to step S92, where the subplan and costs of the equivalent node
will be copied and thereby associated with the present successor node
n.sub.j. However, if an equivalent node is not found, the process will
proceed to step S94, where the motion expert will be queried for a
proposed subplan, a k cost and an h cost. If any of the costs are
infinity, the present successor node will be aborted, proceeding to a
next successor node and again commencing subplanning and cost assignment
for the next successor node. Assuming that the proposed subplan and costs
have been obtained the process will process to step S98, where the
results will be awaited from the motion expert. Additional processing may
be performed to obtain a subplan and costs regarding different aspects of
the system which will be related to performance of the overall bend
sequence proposed by the bend sequence planner. In this regard,
additional experts may be provided as indicated by the reference numeral
S100. For example, FIG. 5A shows a sensing expert. The subplanning and
cost assignment process could be appropriately modified to include steps
such as testing for permutability, querying the additional expert (e.g.,
sensing expert) for a proposed subplan and costs, and, at an appropriate
location within the process, awaiting the results from the additional
expert.
[0264] Once the results from the motion experts have been obtained, as
determined at step S98, the process will proceed to step S102 which is
shown at the top of FIG. 23D. In step S102 the f value for node n.sub.j
will be calculated in accordance with the formula:
f.sub.nj=(k'+h).sub.HE+(k'+h).sub.TE+(k'+h).sub.ME. Then, in step S104,
the f value will be adjusted based upon any heuristics which pertain to
the successor node n.sub.j. In this regard, if it is a desired node,
i.e., it has beneficial or desired heuristics which say that this node is
preferable over other nodes, a value will be added to the f value.
However, if the node is undesired, a value with be subtracted from the f
value.
[0265] FIG. 24 illustrates an example flat workpiece 16, and several nodes
expanded during the performance of a state-space search by the bend
sequence planner illustrated herein. Various costs are shown which are
assigned to the nodes throughout the search process. As shown, flat
workpiece 16 has two portions a, b which are to be bent to form flanges.
First flange a is placed in between two tabs c, d. First flange a is to
be bent along bend line 1, and second flange b is to be bent along bend
line 2. The first node n.sub.0, i.e., the root node, of the search tree
corresponds to flat workpiece 16. Successor nodes of node n.sub.0 include
nodes n.sub.1 and n.sub.2, which correspond, respectively, to bend lines
1 and 2. In the illustrated example, it is assumed that a bend along bend
line 1 would be performed with flange a inserted into the die space of
the bend press, and that a bend along bend line 2 would be performed with
flange b inserted into the die space. Thus, there are no bend twins
illustrated in the tree of FIG. 24. There is only one node per bend line.
[0266] In the event that the bend sequence planner is designed to assign
bend twin nodes for each bend, the alternate node would likely be
constrained in the present example. For example, it would likely not be
possible to perform a bend along bend line 1 by inserting flange b into
the bend press, since flange a is very short, and thus cannot be grasped
by a robot gripper during execution of the bend.
[0267] At the first level of the search, two successor modes and n.sub.2
are generated as successor nodes. In forming these two nodes, the bend
sequence planner may ask each of the holding expert, tooling expert, and
motion expert for the incremental cost (i.e., h and k costs)
corresponding to that made. For example, the costs that are assigned to
node n.sub.1 are illustrated in the box corresponding thereto as, shown
in FIG. 24. A holding expert assigned a k cost (i.e., the cost that it
takes to move from the parent node n.sub.0 to the present node) of 0.
This signifies that a grip location can easily be found an workpiece 16,
and that there is need to reposition the grip of the robot an the
workpiece before performing bend 1 as a first bend in the bend sequence.
The holding expert further assigned an h cost of 30. The number 30
represents an approximate amount of time (30 seconds) which it will take
to reposition the gripper's grasp an the workpiece 16 (i.e., to perform a
repo). This value represents that the holding expert has predicted that
one repo will be needed in order to complete the bend sequence associated
with workpiece 16. The h cost is a predicted cost to complete the bend
sequence from the present node 4 to the final goal node.
[0268] The costs assigned by the tooling expert include a k cost of 600
and an h cost of 600. The k cost is the incremental amount of time (due
to tooling) associated with performing the bend of that node. In this
case, in order to perform the bend of bend line 1, a first stage must be
placed an the die rail of the bending workstation. An approximated time
for installing the first stage is 600. Accordingly, the incremental k
cost (for tooling) from n.sub.0 to n.sub.1 is 600 seconds. The predicted
additional cost from node n.sub.1 to the goal node (i.e., the h cost for
tooling) is calculated to be the time needed to install one additional
stage, and thus is 600 seconds.
[0269] The costs assigned by the motion expert include an incremental k
cost of 5 (an estimated 5 seconds), equal to an approximated robot travel
time in moving from n.sub.0 to node n.sub.1. The costs assigned by the
motion expert further include a predicted future h cost of 15 seconds,
which is equal to a running average of all k costs evaluated so far
(since n.sub.0) multiplied by a summation of the number of remaining
bends and twice the number of predicted repos: h=k.sub.AVE [number of
remaining bends+(number predicted repos) (2)]. The nether of predicted
repos is multiplied by 2, since two movements are required per
repositioning. One movement is required to take the robot from a present
stage to the repo gripper, and a second movement is required to
reposition the robot gripper's hold on the part. The k value for the next
node is calculated based upon the amount of time that it takes to move
from the repo gripper to the appropriate stage for the next bend.
[0270] The alternate node at the first level of the search is node
n.sub.2. This node corresponds to bend line 2. The incremental costs
include k and h costs assigned by the holding expert, k and h costs
assigned by the tooling expert, and k and h costs assigned by the motion
expert. The k and h costs assigned by the holding expert are 0 and 30
respectively. The holding expert assigns a k cast of 0, because no
repositioning is necessary to go from node n.sub.0 to node n.sub.2.
However, a holding h cost of 30 is assigned because one repo is predicted
to be necessary in order to complete all of the bends of the bend
sequence, i.e., to get to the goal node. This becomes apparent when
viewing workpiece 16. Depending an which bend is done first, since the
bends are on opposite sides of the workpiece 16, it will be necessary to
reposition the robot's grasp an workpiece to be at the other side of
workpiece 16 in order to perform the other bend. Further, since the
workpiece is somewhat arrow, it would not be possible to locate the robot
gripper at either the left or right sides of workpiece 16 so that the
workpiece can be grasped at the same location for both bends. If the
robot gripper was positioned at one of the sides of workpiece 16, robot
gripper would likely collide with the tooling (the punch tool) of the
bend press when the die is raised to perform the bend.
[0271] The k cost assigned by the tooling expert again is 600, since the
bend, being the first bend introduced in the search, will require at
least one stage. 600 seconds is an approximated time for installing a
stage, and thus is assigned as the incremental k cost to go from node
n.sub.0 to node n.sub.2. The h cost assigned by the tooling expert is
600, since a predicted additional stage will be necessary to go from node
n.sub.2 to the goal node. The motion expert assigns a k cost of 4, and an
estimated h (future) motion cost of 12. The k cost assigned by the motion
expert for node n.sub.2 is less than the k cost assigned for node
n.sub.1. This is because bend line 2 is longer than bend line 1, and thus
requires a larger stage. In a typical bending workstation, such as the
Amada EM100 workstation illustration in FIG. 1, it is preferred that
longer stages be placed in the center of the die rail, and that shorter
stages be placed off to the sides. Thus, to go from an initial position
before any bends are performed (at node n.sub.0) to a center stage would
require less movement by the robot than moving to a stage set off to the
side of the die rail. Accordingly, the calculated robot travel time,
without regard to the collisions, from the loader/unloader (L/UL) to the
center stage in performing bend 2 is estimated to be 4 seconds, and less
that it would take to get a stage positioned at the left side of the die
rail which is where the smaller stage would be placed along the die rail.
Since the h cost is calculated as a function of the present ruing average
of the k cost calculated so far, the h cost is also a lower value of 12
seconds.
[0272] At the first level of the search, the respective total incremental
costs performing bends 1 and 2, respectively, are 1250 and 1246.
Accordingly, node n.sub.1 has a total incremental cost of 1250, and node
n.sub.2 has a total incremental cost of 1246, the total cost being
assigned by each of the experts queried by the bend sequence planner.
[0273] It is noted that the only two nodes at the first level of the
search included a node for performing bend 1, and a node for performing
bend 2 (nodes n.sub.1 and n.sub.2). The first level did not include a
node for performing a repo. This is because the search is constrained so
that the first bend to be performed at the first level after the root
node does not include a repo. It would be unnecessary for a repo to be
performed as a first step in the bend sequence, since the robot gripper
can be placed anywhere at the start to correspond to any particular bend.
However, at the next level of the search, a repo is included as a
possible node, in addition to the one or more bends which comprise the
rest of the bends leading to the goal node. Accordingly, the next level
of the search includes nodes n.sub.0) which corresponds to bend 1, and
n.sub.4 which corresponds to a repo before performing the next bend in
the bend sequence. At node n.sub.3, upon being queried by the bend
sequences planner, the holding expert assigns a cost of infinity, since
there are no available grasp regions that were used in performing bend 2
that can also be used to perform bend 1. If there was a grass region that
was used in order to perform bend 2 that could also be used to perform
bend 1, then the robot gripper could be placed within that intersecting
region, and the repositioning of the gripper would not be necessary when
going from the completed bend 2 to bend 1 (i.e., from node n.sub.2 to
node n.sub.1). However, in this, case, the holding expert has determined
that there is no such intersection of grasp regions, and thus the
incremental k cost for holding is infinity. The predicted h cost is not
even relevant, nor are any of the other costs which might be assigned by
the other experts such as the tooling expert and the motion expert, since
bend 1 cannot be performed at the present point in the bend sequence,
without first performing a repo. Thus, node n.sub.3 is no longer
considered, and the bend sequence planner proceeds to the repo node
n.sub.4, and queries the respective experts for their assigned costs
associated with that node.
[0274] After repo node n.sub.4, the holding expert assigns a k cost of 30,
which signifies that approximately 30 seconds will be needed to perform a
repo at the present point in the bend sequence. A predicted h cost of 0
is assigned by the holding expert, since it is predicted that no
additional repos will be needed between the present node n.sub.4 to the
goal nodes. After the holding expert assigns its cost, the tooling
expert, upon being queried by the bend sequence planner, assigns a k cost
of 600, which equals the approximate time (600 seconds) to install an
additional stage which will be needed in order to perform bend 1 (along
bend Line 1), since the stage which was utilized to perform bend 2 (which
has a length equal to the length of bend line 2) cannot be used to
perform bend 1 since such a stage cannot fit between tab portions c and d
of workpiece 16. No additional predicted stages or tooling change is
expected by the tooling expert; and accordingly, the tooling expert
assigns an h cost of 0 to be associated with node n.sub.4. It is noted
that the tooling expert may initially determine a total initial h cost
based upon the total amount of predicted stages that will be needed to
perform the complete bend sequence, either at an initial point in the
search before performing the search. ID the present example, a total
initial h cost is calculated to be 1200, since two predicted stages have
been predicted to be necessary to perform bends 1 and 2 on workpiece 16.
Throughout the search, the k cost is either 0 (with no extra stages
needed) or 600 (if an additional stage is needed for the bend
corresponding to the present node). The b cost for a given node is equal
to the total initial h cost minus all of the preceding and current k
costs leading up to and including the given node. Accordingly, for node
n.sub.4, since the preceding k cost leading to n.sub.4 was 600, and the
present k cast for n.sub.4 is 600, he h cost is 1200-600-600=0.
[0275] The cost assigned by the motion expert to correspond to node
n.sub.4 include a k cost of 8 and an h cost of 4. The k cost is estimated
to be twice the average preceding k cost, since two motions are needed in
order to perform a repo. One movement is needed to take the workpiece
from a stage at which the workpiece was left from a previous bend to the
repo gripper, and the second movement is to move the robot gripper to the
repositioned location while the repo gripper is grasping workpiece 16.
The predicted h cost assigned by the motion expert for a repo node is the
predicted additional costs needed to perform all future movements in the
bend sequence. In this case, h is estimated to be the h value calculated
for a previous node n.sub.2 minus the present k cost, and thus is
estimated to be 4 seconds for node n.sub.4. The total incremental costs
are then added to the total of all previous k costs preceding that node
(in this case repo node n.sub.4). Thus, all the incremental associated
with node n.sub.4 are added to a total previous k costs of 604 which were
previously calculated in association with node n.sub.2, to obtain a total
cost value of 1246.
[0276] The bend sequence planner will, in performing its state-space
search, thus choose n.sub.4 as the best node and will proceed with
expanding that node to form its successor nodes. The successor nodes of
repo node n.sub.4 include node n.sub.5. In this case, node n.sub.5 is the
goal node, since it results in the workpiece 16 having all of its bends
completed to form a 3D part. The costs determined by the relative experts
include a presumed holding k cost of 0, a calculated tooling k cost of
600, and a calculated motion k cost of 4. Since the present node n is
known to be the goal node, no h costs are calculated. The previous total
k costs 642 seconds. Accordingly, 642 is added to the k cost for tooling
of 600 and the k cost for motion of 4 to be equal a total f value of
1246. Such an f value is the cheapest f value among the nodes still left
on OPEN. Accordingly, this node will be checked to see is it is a goal
node, and if it is a goal node, the solution path will be generated to
include (in order) bend 2 which corresponds to node n.sub.2, a repo which
corresponds to node n.sub.4, and bend 1 which corresponds to node
n.sub.5.
[0277] (d) Permutability Determination
[0278] As described above, in connection with FIGS. 23A-23D, before asking
an expert for the costs associated with a particular node, a test is
performed for the permutability of that node regarding the subplan and
costs for each expert. For example, in step S66 shown at the top of FIG.
23A, a test is performed for the permutability of a particular successor
node n.sub.j to determine if it is merely a permutation of another node,
and thus has an equivalent set of subplan and costs if this is the case,
it would be wasteful to again ask the holding expert for a proposed
subplan and associated k and t costs, since these parameters are already
known, and can be obtained by merely referring to the other equivalent
nodes. FIG. 28 illustrates a graph of compared histories of nodes b6' and
b6, which have been generated by the bend sequence planner in performing
its state-space search. Assuming that the subplanning and cost assignment
process of the bend sequence planning algorithm was being performed on a
particular node b6, at each of steps S66 (FIG. 23A), S76 (FIG. 23B), and
S88 (FIG. 23C), a test will be performed for the permutability of that
node with any other nodes in the search tree regarding the holding
expert's subplan and costs, the tooling expert's subplan and costs and
the motion expert's subplan and costs, respectively. In testing whether
or not a node is a mere permutation of another node within the search
tree, a node such as node b6 illustrated in FIG. 23 will be compared to
another node in the search tree, such as node b6', also illustrated in
FIG. 28. In making the comparison, the history of node b6, which includes
nodes b2, r1, b4, b3, r2, and b5, is compared to the history of b6',
which includes b2', r1', b2', b4', r2' and b5'.
[0279] Depending on the particular implementation of the bend sequence
planner and the particular calculations made by each of the experts, the
method to be used to determine whether one node is a permutation of
another will vary. However, an analysis can be performed of the various
permutations of nodes, and the various subplans and costs that can be
associated with each node at various levels of the search, in order to
determine under what conditions a node is a mere permutation of another
node in the search. Based upon the results of the analysis, an
appropriate method may be formed for determining whether a node is a
permutation of another node, in terms of the subplan and costs assigned
for the node. Thus, while the above-described examples have been given
for determining the permutability or a node regarding the subplan and
costs assigned by the holding pert and the motion expert, respectively,
alternative methods may be used depending upon particular variations and
implementations of the bend sequence planner and the experts of a system.
A similar method can be provided for determining whether or not a node is
permutable with another node in terms of the subplan and costs assigned
by a motion expert. Thus, a specific embodiment for making that
determination is not described in detail herein.
[0280] 3. Expert Modules, Subplanning, and Dialogue Between Modules
[0281] FIGS. 29-31 respectively include charts which depict he dialogue
between the bend sequence planner and the holding expert, tooling expert,
and motion expert of the illustrated embodiment planning system 71 as
shown in FIG. 5A Referring to FIG. 29, which illustrates the dialogue
between bend sequence planner 72 and holding expert 82, several query
arrows Q1, Q2, Q3, Q4 and Q5 are illustrated to represent a query message
being forwarded from the bend sequence planner 72 to holding expert 82.
In addition, several response arrows R1, R2, R3, R4, and R5 are
illustrated to represent response messages from holding expert 82 to bend
sequence planner 72. While the queries and responses are indicated in
FIG. 29 with consecutive numbers from 1 to 5, this is not meant to
indicate that there could not be additional queries and responses, in
between, before, or after the queries and responses illustrated in FIG.
29. Rather, these numerals are merely provided to facilitate the
description of the dialogue between the modules as shown in FIG. 29.
[0282] At some point before commencing its search (e.g., at step S30 as
illustrated in FIG. 22A), bend sequence planner 72 forwards an initial
query Q1 to holding expert 82, which includes, among other things, a
start command, and a file name for the part to be produced. This query Q1
could be forwarded utilizing a VERB "plan . . . " (which is utilized to
initialize a module for planning a part). Upon receipt of query Q1, the
holding expert then performs an input operation indicated by I1, which
includes reading an appropriate file which includes geometric,
topological, feature information, and other information regarding the
parts to be produced. After the part is read, initial planning steps will
be performed, as indicated in block P1. More particularly, holding expert
82 will perform gripper selection, which includes picking a robot
gripper, and which includes picking a temporary repo gripper. In
addition, holding expert 82 will predict the minimum number of repos that
will be needed to complete the overall bend sequence. After performance
of the initial planning steps in P1, holding export 82 then sends the
resulting information back to bend sequence planner 72 via a response R1.
The response includes a savelist which includes a list of names of
attributes to he saved by bend sequence planner 72. The savelist further
includes, along with each attribute name, the parameters and values
accompanying each attribute to be saved by bend sequence planner 72. The
attributes to be saved by bend sequence planner 72 at this paint include
the selected robot gripper, the temporarily selected repo gripper, and
the values indicative of the m predicted number of repos which will be
necessary to complete all of the bends of the bend sequence.
[0283] After response R1 (egg., in step S38 of the bend sequence planning
process illustrated in FIG. 22B), the search is started. After commencing
the search, a query Q2 is sent to holding expert 82 (e.g., at step S72 of
the bend sequence planning process illustrated in FIG. 23A). The query Q2
includes bend sequence information, and a request for a proposed subplan,
a k cost and an h cost associated with that particular node. In this
regard, a "get" FEL command may be utilized to perform this query. After
receipt of query, Q2, holding expert 82 will then perform planning steps
indicated in block P2, which include predicting the number of repos which
will be needed after performance of the presently proposed bend-related
operation, determining the grasp location (i.e., the location at which
the robot should grasp a workpiece in order to perform the presently
proposed bend), and potential repo locations (for the repo gripper's
grasp on the workpiece), and will also determine k and h costs associated
with the particular proposed bend-related operation (which would include
either a bend or a repo). Once all the planning is performed in block P2,
holding expert 82 will then respond with a response R2 to bend sequence
planner 72, the response including the k and h costs, a subplan, and
various attributes which will be saved by bend sequence planner 72 as
specified in a savelist forwarded by holding expert to bend sequence
planner 72. If the presently proposed node is not a repo node, k will
either be equal to 0 or infinity, 0 indicating that no repo is necessary
at the present node, and infinity indicating that there are no available
places for the robot to grasp the workpiece without first performing a
repo. The h value will be equal to 30 (an estimated amount of time it
takes to perform a repo) times the predicted number of repos from the
present node to the goal nodes. If the present node is a repo node, k
will be equal to 30, if the repo is possible, or infinity if a repo
cannot be performed at the present level of the search for the present
node. The h cost will be 30 times the predicted number of repos which
will need to be performed after performance of the present node
bend-related operation.
[0284] After performance of processing in relation to query Q2 and
response R2, bend sequence planner 72 will then very various other exerts
including tooling expert 80 and motion expert 84, in order to obtain
their respective subplans and costs, and repeatedly will query each of
the experts in association with each node generated during the search in
order to form a complete bend sequence plan which includes nodes from the
start node to the goal node. Once the search has ended and a solution has
been obtained, bend sequence planner 72 will forward another query Q3 to
holding expert 82 which includes a request for the suction cup plan,
again utilizing the "get" verb of EEL. In reasons to query Q3, holding
expert 82 will perform suction cup planning as indicated by block P3.
Suction cup planning will include a determination of what locations along
the workpiece loader/unloader may place its suction cups during loading
and unloading of the workstation. Once the suction cup planning has been
completed, holding expert 82 will pond with response R3 to bend sequence
planner 72. Bend sequence planner 72 will subsequently again query, by
query Q4, holding expert 82, for the final repo gripper that will be used
and the location of the repo gripper on the workpiece for various stages
of the bend sequence. The "get" verb of FEL may be used for this query.
After receipt of query Q4, holding expert 82 will perform the planning
indicated in block P4, which includes repo planning to be performed after
the searched. In performing the repo planning after the search, holding
expert 82 chooses a true repo gripper to be utilized in execution of the
resulting bend sequence plan, and finalizes the repo position based upon
the chosen repo gripper. After completion of the repo plan after the
search, holding expert 82 will forward a response R4 to bend sequence
planner 72. Thereafter, in query Q5, bend sequence planner 72 will
further query holding expert 82 for a backgage plan. Accordingly, holding
expert 82 will perform backgage planning as indicated by block P5, and
will respond to bend sequence planner 72 with the appropriate backgage
plan in response R5.
[0285] Once all the planning has been performed by holding expert 82,
including the final planning after the search, bend sequence planner 72
will have queried the motion expert 84 for its final plan information,
and will await, before execution of the plan, the results of the final
motion plan from motion expert 84. After receipt of the final motion plan
from motion expert 84, bend sequence planner 82 will then proceed to
forward the final plan to sequencer 76.
[0286] In the illustrated dialogue between bend sequence planner 72 and
tooling expert 80 in FIG. 30, several queries are illustrated from bend
sequencer planner 72, indicated by query lines Q11, Q12, and Q13, and
several responses are illustrated by response line R31, R12, and R13. As
indicated by the first query line Q11, at some point in time before
commencing its search (e.g., at step S32 in the bend sequence planning
process illustrated in FIG. 22A), bend sequence planner 72 will command
tooling expert 80 to start its processing, and will forward the name of
the part to be produced with the use of a "plan" verb in FEL. Upon
receipt of query Q1, as indicated by input line I2, tooling expert 80
will then read an appropriate part file. Subsequently, tooling expert 80
will perform various planning steps as indicated by blacks P11, P12 and
P13. These planning steps include selection of a tool profile,
bin-packing, and performing a calculation of an initial h value (which
corresponds to the total number of predicted stages that will be needed
to perform all of the bends of the bend sequence). The bin-packing
algorithm comprises the selection of tool segments that will together add
up to the appropriate stage length far each stage to he utilized by the
bending workstation in performing the bends of the bend sequence. Once
all of the appropriate plan information is gathered in planning blocks
P11, P12, and P13, tooling expert 80 will respond as indicated by
response line R11, to bend sequence planner 72, and will indicate to bend
sequence planner 72, via a savelist, various attributes to be saved.
Subsequently (e.g., at step S38 in FIG. 22B), the bend sequence planner
72 will commence it search. Once the search is commenced and after the
information has been gathered form holding expert 82, bend sequence
planner 72 forward a query Q12 to tooling expert 80, which includes the
bend sequence at that point of the search and a query far the subplan and
associated k and h cosmos. The verb "get" in FEL is utilized for this
query. Tooling expert so then performs planning steps, as indicated by
planning block P14, which include picking of a stage length to correspond
to a bend and a location along that stage where the bend should be
performed, arranging the stages, calculating the k and h costs, and
performing fine motion planning. Then, tooling expert 80 responds to bend
sequence planner 72 via response R12, and forwards the k and h costs and
the associated subplan information to bend sequence planner 72. A
savelist is also included in response R12 which indicates information and
attributes that should be saved by the planner. Subsequent queries and
responses may be exchanged throughout the search, with tooling expert 80
and with other experts 82 and 84 before the search is finished. Once the
search ends and a solution has been found (e.g., in step S56 in FIG. 22D
of the bend sequence planning process), a query Q13 instructing the
tooling experts to finalize will be forwarded to tooling expert 80.
Tooling expert 80 will then perform its appropriate final processing, and
return, via response R13, any final information to bend sequence planner
72. Subsequently bend sequence planner 72 requests final information and
final processing to be performed by motion expert 84 and will await the
results thereof. Once the final motion planning results have been
obtained by motion expert 84, bend sequence planner 72 will compile all
information to form a final plan, and will forward the same to sequencer
76.
[0287] As illustrated in FIG. 31, bend sequence planner 72 communicates
with motion expert 84 before during and after performing a search, in the
form of queries and responses which may include the queries indicated by
query lines Q21, Q22 and Q23, and respective response lines R21, R22 and
R23. Initially (e.g., as indicated at step S34 in FIG. 22A), a first
query Q21 may be forwarded to motion expert 84 which includes a start
command, and the name of the part to be produced. Upon receipt of query
Q21, motion expert 84 will then input the appropriate part file and a
channel file which represents all of the free space channels through
which the part and the robot may be manipulated in performance of the
various bends and operations of the bend sequence. This input is
indicated by I3. Thereafter, motion expert 84 will send a response R21 to
bend sequence planner 72, indicating, essentially, that the information
was read in and acknowledging that it is ready for the next query by bend
sequence planner 72. Sometime thereafter (e.g., at step S38 in FIG. 22B),
the state-space search of the bend sequence planner 72 will commence.
Then, bend sequence planner 72 will query holding expert 82 for various
information while performing the first level of the search, then query
tooling expert 80, and thereafter send a query Q22 to motion expert 84.
Query Q22 includes information about the bend sequence, the gripper
location and the bend locations an the stages (in the form of a bend
map). This query may be sent to motion expert 84 by using "get" verb in
FEL. Upon receipt of query Q22, motion expert 84 will perform processing
in processing black P21, and thus will develop a subplan and determine
the k and h costs for performing the bend proposed by bend sequence
planner 72 at that particular point in the bend sequence. The resulting k
and h costs and subplan are returned to bend sequence planner in response
R22. Afterward, additional processing by other experts 80, 82, and by
motion expert 84 may be performed in order to complete the search.
[0288] Once the search has ended and the solution has been obtained, bend
sequence planner 72 will send an additional query Q23, which includes a
finalize command. With query Q23, bend sequence planner 72 will forward
information to motion expert 84 so that motion expert 84 may perform all
final planning operations. Such forwarded information would include the
bend sequence, the gripper locations for each bend in the sequence, the
repo locations for each repo to be performed, the bend maps corresponding
to the bends of the bend sequence, and all fine motion plans which have
been developed by tooling expert 80, in order to bring the workpiece into
and cut at the die space when performing each bend in the bend sequence.
Motion expert 84 utilizes that information to perform the processing
indicated in processing block P22. More particularly, motion expert 84
will figure out the various starting and finishing paints in order to
develop a gross motion plan. A search algorithm is then performed in
order to form paths between the gross motion starting and finishing
locations. Then, the resulting gross motion paths are linked with the
fine motion paths so that a complete motion scheme is formed, commencing
with acquiring the workpiece from the loader/unloader during loading at
the workstation, bringing the workpiece to each of its bends, and finally
bringing the finished workpiece to the loader/unloader to be unloaded
from the workstation.
[0289] The complete motion plan is then returned to bend sequence planner
72 in a response R23. Once the complete motion plan has been received by
bend sequence planner 72, bend sequence planner 72 may compile the
complete plan, and forward the same to sequencer 76 for execution.
[0290] FIG. 32 illustrates a flow chart of an example process for
performing robot gripper selection. This process is performed, e.g., in
planning block P1 in FIG. 29. In a first step S128, a library of grippers
is read in. Then, in step S130, the process prunes obviously bad
grippers, e.g., if they have certain dimensions which are inappropriate
for the type of work being performed by the bending workstation. In step
S132, a minimum number of repos for each gripper is predicted.
Thereafter, in step S134, the one or more grippers having the smallest
predicted number of repos is selected. Then, in step S136, among the
selected grippers, all of the grippers having the largest width are
selected. Among the remaining grippers, those with the smallest length
form the tool center point to the front tip of the gripper, are selected.
Among those selected grippers, the grippers with the shortest knuckle
height are selected. If there is only one gripper having the largest
width among the selected grippers, then that gripper will be selected and
no further determination is needed as to the length of the gripper or as
to the knuckle height of the gripper. Similarly, if several grippers have
the largest width among the select grippers, but only one gripper has the
smallest length, then that gripper will be selected and no further
determination will be needed as to the knuckle height of the gripper. If
there are several grippers left that have an equal shortest knuckle
height, as determined in step S136, then any one of those grippers may be
chosen. Thereafter, in step S138, the chosen gripper is returned to the
holding expert.
[0291] As illustrated in FIG. 22, a prediction must be made as to the
minimum number of repos needed for each gripper in step S132. Such a
prediction of the minimum number of repos, before the search, a be
performed by utilizing the exemplary process illustrated in FIG. 34A. The
goal of the process depicted in FIG. 34A is to, for a given robot gripper
and a given part, predict the minimum number of repos that will be needed
in order to form the complete 3D part. Among the information utilized. In
order to perform form the prediction, information is needed regarding
both the 2D part, and 3D part (the completely formed bent part). In a
first step, discrete points are generated around a periphery of a part of
a 2D representation of the part. Such discrete points, located a set
distance from the edge of the part, are illustrated in FIG. 33A. The
granularity shown in FIG. 33A is merely for the purpose of explanation of
the algorithm, and does not necessarily reflect a preferred granularity.
The granularity of the discrete points may be tied in order to obtain an
optimum accuracy, while not sacrificing the speed of the search process.
[0292] Assuming a grasp position at a first one of the discrete points, a
bend set including all of the possible bends for that robot grasp
position will be identified in step S142, assuming that the part is still
flat, (in 2D) and that the part is at the L/UL. This is repeated for each
discrete point around the periphery of the 2D part 16a (e.g., as shown in
FIG. 33A), and all bend sets for each corresponding robot grasp point are
identified.
[0293] Thereafter, in step S144, a determination is made as to the minimum
number of unions of the bend sets determined in step S142 that will form
a complete set of bends (i.e., all of the bends of the bend sequence).
This minimum number of unions will be identified as a 2D minimum number
of repos R2. Thereafter, in step S146, the discrete points are generated
around the periphery of a 3D part 16h (e.g., as shown in FIG. 33B). It is
noted that the granularity shown in FIG. 33B is only shown by way of
example, and does not necessarily represent the preferred granularity for
performing the present algorithm. The appropriate granularity for the
generation of points around the outer periphery of the part may be
modified in accordance with the desired accuracy and speed of the
algorithm. For each point generated around the periphery of 3D part 16b,
the corresponding bend set (i.e., all of the possible bends that may be
performed when the robot is grasping the part at that location) is
identified, thereby identifying all of the, bend sets for all of the
discrete points around a periphery of 3D part 16b. Then, proceeding to
step S150 (in FIG. 34B), the minimum number of unions required to get a
complete set of bends (i.e., all of the bends of the bend sequence) is
determined, and is called R3 which represents the minimum number of 3D
repos. In performing step S148, all of the possible sets of bends in
grasping at the respective discretized X positions an 3D part 16b are
formed assuming a particular gripper, and further assuming that the 3D
part is located at the repo station. At step S152, the values R2 and R3
are returned to the algorithm for selecting the robot gripper (e.g., as
disclosed in FIG. 32) and to the holding expert. The value R3 represents
an upper bound number of predicted repos, since it is more difficult to
hold the workpiece when it is completely bent, i.e., a 3D part, than it
is to hold the workpiece in performing bends when it is a flat part. The
value R2 represents a lower bound number of predicted repos. The
selection of robot gripper algorithm and the holding expert may each
utilize either the lower value R2, the upper value R3, or a combination
of the two in performing their calculations and determinations. For
example, for purposes of choosing a robot gripper (in step S134 shown in
FIG. 32), the lower number R2 may be first considered. IF there are more
than one grippers with an, equal smallest predicted number of repos R2,
but with different values R3, then the grippers with the smallest value
R3 may be selected. These selected grippers, if more than one, would then
be further evaluated in accordance with step S136, as shown in the flow
chart of FIG. 32.
[0294] FIG. 35A illustrates a process for predicting the minimum number of
repos which can be used during the search. The algorithm for predicting
the minimum number of repos used before the search did not include an
evaluation of intermediate pats, in order to save time. In order to have
better accuracy throughout the search, the algorithm depicted in FIG. 35A
also considers a formed intermediate part, and the variations of the part
as it moves throughout the various bends.
[0295] In a first step S154, an intermediate part is formed, by calling an
appropriate function in a geometric modeling library. The intermediate
part includes all of the bends in the bend sequence so far up to the
present node of the search. Thereafter, in step S156, discrete points are
generated around the periphery of the intermediate part, in a manner
similar to that described in the process of FIGS. 34A-34B, and in a
manner similar to that illustrated in FIGS. 33A and 33B. Once the
discrete points are generated, in step S158, a bend set is determined for
each grasp location point. In other words, a determination is made as to
all of the possible bends that may be performed while the robot gripper
is grasping the part at each discretized point. In step S160, a
determination is made as to the minimum number of unions of the bend sets
generated in step S158 needed to form a complete set of bends (i.e., all
of the bends of the bend sequence). This number is called Ri. Once the
value Ri is determined, then, in step S162, discrete points are generated
around the periphery of the 3D cart. A bend set (i.e., the possible bends
that may be performed for each gripper position along the discretized
points) is then identified in step S164. The minimum nether of unions of
the bend sets is then determined which would be necessary to form a
complete set of bends (i.e., all of the bends of the bend sequence). That
minimum number of unions is referred to as R3 Then, in step S168, a low h
cost Ri(c) and a high h cost R3 (c) are assigned and returned to the
planner. The cost values Ri(c) and R3(c) are estimates of the amount of
time it takes to perform a repo times the minimum number of repos (Ri and
R3 respectively). Instead of sending the low h cost and high h cast as
noted in step S168 to the holding expert, the process for predicting the
minimum number of repos during the search may send the values Ri and R3
themselves.
[0296] FIG. 36A illustrates an example process for determining the robot
rasp locations, as performed in planning block P2 in the chart depicted
in FIG. 29 by holding expert 82. In a first step, S170, an intermediate
part (having the bends corresponding to the present node of the
state-space search of the bend sequence planner) is constructed.
Thereafter, in step S172, all edges which are not appropriate for
grasping are rejected. For example, an edge may be rejected if it is not
a face which is parallel to the robot's XY plane. In addition, an edge
may be rejected if it is inaccessible by the robot gripper when the part
is loaded in the die space. In addition, the edge may be rejected if the
edge is too close to the die, so that the robot would collide with the
tooling before and/or during the bend operation. The edge may also be
rejected if grasping the workpiece on such an edge would cause the robot
to be outside of its work space.
[0297] For each non-rejected edge, the steps following step S172 are
performed (shown in FIG. 36A). In step S174, for each non-rejected edge,
every vertex is transformed from sheer coordinates to edge coordinates.
In this regard, by way of example, an illustration is provided in FIG. 37
in order to define an example set of sheet coordinates X.sub.5 and
Y.sub.5 on a workpiece 16 having bend lines 1, 2, 3, and 4, which may be
transformed to edge coordinates X.sub.e and Y.sub.e which correspond to
the edge of workpiece 16 which is next to bend line 1.
[0298] In terms of edge coordinates, each edge is discretized ties into
points along the X axis n step S176. Thereafter, in step S178, for each
discretized ties point, X.sub.p, grasp lines are generated which extend
along the Y axis. In order to generate the grasp lines along the Y axis,
several process steps are performed. For example, referring to FIG. 38,
for a discretized point x.sub.p, a (broken) grasp line 306 is formed
along the Y axis. For the discretized ties point x.sub.p, an initial Y
value Ys is proposed which is set at a distance from the edge (e g., 3
mm). It is assumed that the gripper is oriented to be normal to the X
axis in edge coordinates. A determination is then made as to whether or
not the point Ys is out of the robot's work space, while the workpiece is
at the loader, the repo station, or at one of the stages. If this is the
case, a new point along a line corresponding to the discretized ties
point Xp and normal to the edge is found that is within the work space.
For the first valid Yp, a determination is made as to whether Yp is
beyond the gripper's maximum reach. If so, the value Yp is rejected in
addition, a determination is made as to whether or not the gripper can
make good pad contact with the part if the gripper is at the position Yp.
If no good pad contact can be made, the position Yp is rejected. New
values for Yp are proposed, until line 306 reaches a first maximum
location at which the robot can grasp the part, that first maximum
position being Yf. This distance is defined by the fact that pads cannot
have goad contact any more due to holes or due to a boundary in the part.
For example, a maximum position Yf is found right before a first hole 307
in the workpiece 16 shown in FIG. 38. The next viable or potential Yp is
then found along the line running perpendicular to the edge and is
defined as a new initial or starting position Ys'. Y values Yp are then
proposed and tested until an additional final position Yf' is found due
to limits because the pads cannot have good contact or due to the fact
that the part has a boundary at that location. Thus, as shown in the
workpiece in FIG. 38, Yf' is determined to be just before second hole
308. This process is repeated until the end of the line 306 reaches the
gripper's maximum reach or the boundary an the apposite side on workpiece
16. Thus, an additional line segment extending from Ys" to Yf" is
generated.
[0299] Once the grasp lines have been generated for each discretized point
Xp, later in step S130, a common grasp area is defined for the present
bend in the search, and is defined to be the intersection of the current
grasp lines with the grasp lines determined for previous bends since the
last chosen repo in the search. A k cost of 0 is assigned if the
intersection is not equal to 0, and a k cost of infinity is assigned if
the intersection is 0. This signifies that the present bend cannot be
performed since the grasp areas needed to perform the bend are not common
with the previous bend. Thereafter, in step S182, a temporary grasp
location is selected within a defined common area.
[0300] Whenever it is determined that there is no intersection of grasp
regions, and thus a repo is necessary, final grasp locations are selected
for the bends preceding the repo, since it is known that the grasp
location will not change any further for that set of bends. A final grasp
location is selected such that a large repo are is generated.
[0301] FIG. 39 illustrates the evolution of the common grasp area as
determined throughout a search, as calculated by a determined robotic
grasp locations process, e.g., as illustrated in FIGS. 36A-36B. The grasp
area for bend 1 is first determined as illustrated in view A. Then, with
bend 1 having been already performed, and the corresponding flange being
bent (indicated by the cross-hatched lines in view 3), the potential
grasp regions which can be utilized to perform bend 2 are determined as
illustrated, in view B. The intersection of the regions in views A and B
is then determined as illustrated in view C. Then, bend 2 is performed
(indicated by cross-hatched lines in view D), and the total available
grasp regions which may be utilized to perform bend 3 are determined as
shown in view D. To go from bend 2 to bend 3, an intersection is made of
the regions in views C and D as shown in view E. This signifies that
there is no different intersecting region and that a repo must be done
before bend 3 can be performed (as indicated by the cross-hatched lines
in view F). The repo is then performed, and bend 3 is performed. Before
performing bend 4, the potential robot grasp regions for that bend are
determined as illustrated in view F. In order to determine the exact
grasp position to perform bend 4, an intersection is made of the regions
in views D and F, as indicated in view G. This is the region for the
robot grasp location that can be utilized in order to perform both bends
3 and 4.
[0302] Each bend, which has already been performed, is indicated by
cross-hatched lines being placed on the flange that is bent. The grasp
regions are indicated by a solid black line.
[0303] FIG. 40 illustrates first and second views of a workpiece 16, the
views showing the grasp line regions determined before performing a first
bend, and before performing a second end, respectively. As can be seen in
FIG. 40, the grasp line region 309 comprises a certain large area of the
workpiece 16. The lower view illustrates the intersection of the grasp
line region (i.e., the grasp area) shown in the top view which can be
utilized to perform the first bend and a grasp line region (not shown)
which may be utilized to perform the second bend. Thus, grasp line region
310 is a small subset of the grasp line region 309, and may be utilized
as a grasp location to perform both the first bend and the second bend.
[0304] FIG. 41A illustrates an example embodiment of a process for
determining the repo gripper locations which will be performed during
repo planning after the search as indicated by planning block P4 in FIG.
29. In a first step S184, an intermediate part is constructed. The edges
which are not appropriate are then rejected in step S186. For example,
the process may reject an edge if it does net correspond to a face which
is parallel to the robot's X-Y plane. For each non-rejected edge, the
steps following step S186 are performed. In step S188, the intermediate
part is transformed from sheet coordinates to edge coordinates.
Thereafter, in step S190, the edge of concern is discretized along the X
axis in a manner similar to that illustrated in FIGS. 33A and 33B) with
an appropriate granularity. Then, in step S192, grasp lines are generated
along the Y axis, by generating points along the Y axis from a first
point Ys (e.g., 3 mm) to the gripper's maximum reach along the line which
is placed on the discrete X point. For every point along that line, if
the repo gripper interferes with a previous robot gripper location, that
Y location is rejected. In addition, for each Y position, if the repo
gripper interferes with any portion of the part, that Y position is
rejected. In addition, if there is no good pad contact between the repo
gripper and the part, that Y position is rejected. A line is thus drawn
as shown ii FIG. 38 from an initial position Ys to a final position Yf
which is a first maximum position that the repo gripper may grasp the
part until it hits a boundary portion (e.g., a hole in the part).
Additional sets of initial and final positions Ys and Yf are formed until
the repo gripper reaches its maximum reach (e.g., at Yf" as shown in FIG.
33), in a manner similar to that performed in the process for determining
the robot 's grasp locations as disclosed in conjunction with FIGS. 36A
and 36B.
[0305] A final repo location is assigned (in consideration of previous and
current robot gripper location) when the search reaches the goal or
another repo becomes necessary.
[0306] FIG. 42 illustrates an example embodiment of the process for
performing repo gripper selection before the search. This may not be
actually implemented. In a first step S198, a library of grippers is
read, and in a second step S200, a conservative repo gripper is selected.
A consecutive repo gripper is defined as a gripper which is narrow and
short, and is capable of holding the part (in either 3D or 2D shapes).
The selected repo gripper is a temporary solution, since a final repo
gripper selection will be performed after the search is completed. The
repo gripper selection after the search is illustrated in FIGS. 43A-43B.
In a first step S202, all the intermediate part geometries for the
various bends throughout the bend sequence are constructed in other
words, in accordance with the order of bends determined from the search,
the appropriate intermediate part geometries corresponding to each bend
within the bend sequence are constructed. Then, in step S204., grippers
are pruned, which are deemed inappropriate due to obvious reasons (erg.,
they cannot grasp a part because of insufficient dimensions). Then, in
step S206 available repo grippers are identified based upon two robot
grasp locations which include an initial robot (rasp location before the
repo and a repositioned robot grasp location. Each of these positions has
been already determined in the search process. If the previously
determined temporary repo position, determined during the search, could
be improved upon in view of the repo grippers that are identified as
available, then the position is adjusted. In step S208, if there are more
than one available repo grippers (after pruning), then the repos with the
largest width are selected. If there are more than one repo grippers with
the largest width, then the ones with the smallest length are chosen. If
there is more than one repo gripper with the smallest length, then the
one with the shortest knuckle height is chosen. If there are several repo
grippers with the same smallest knuckle height, then any one of those is
chosen. Currently, a repo gripper is selected such that it allows a
larger robot gripper to be selected and it guarentees a successful
generation of repo gripper locations. The width of a repo gripper is
determined by the dimension of possible area of 3D part for grasping. The
knuckle height of a repo gripper is determined to be taller than the
minimum flange height of 3D part.
[0307] As shown in FIG. 30, in a planning block P12, a bin-packing
algorithm is performed before the search is started. During the execution
of the bin-packing algorithm, a plan is produced that specifies how the
segments should be put together to form each stage in a list of stages to
be chosen from FIG. 44 illustrates an examples bin-packing algorithm. In
a first step S210, the process builds a list of bend line lengths, and
forms a stage length list having stage lengths equal to the lengths of
the bend lines to be formed an the workpiece. In addition, the process
builds or reads a list of available segment lengths which may be chosen
from in order to form the stages in the stage length list. Then, for each
different bend line length (i.e., for each stage length) each of steps
S212 and S214 is performed. In step S212, an A* search is performed in
order to determine a combination of segments which could be used to form
the particular stage. Then, in step S214, the process returns a solution
set of tool/die segments to the tooling experts.
[0308] In performing the A* search, the initial node n.sub.0 is expanded
to include a plurality of nodes at the first level of the search, each of
the expanded/successor nodes at the first level corresponding to one of
the available segment lengths (i.e., lengths of a tool punch and
corresponding die segments). For example, if the available tool segment
lengths are 10 mm, 15 mm, 22 mm, 40 mm, 80 mm and 160 mm, the nodes at
the first level would correspond to each of those segment lengths. The k
cost assigned for each successor node is the length of the segment
corresponding to the present node and the h cost is set equal to the
length of a remaining portion of the stage which is yet to be formed by
the segments (i.e., how far the search process is from the goal)
[0309] FIGS. 45-46 illustrate how the h cost that is assigned by the
tooling expert throughout execution of the search, and forwarded to the
bend sequence planner 72 (in response R12, as shown in FIG. 30), is
calculated. The tooling h cost is determined as a function of the total
number of predicted stages that will be needed to perform all of the
bends in the bend sequence.
[0310] More specifically, h.sub.TE for n.sub.j, h initial is an initial h
cost equal to the total number of predicted stages needed to perform all
bends of the bend sequence multiplied by an approximate amount of time
(e.g., 60 seconds) needed to install each stage, and k'.sub.TE for
n.sub.j is the summed tooling k costs from node n.sub.0 to node n.sub.j.
In order to determine initial h cost (h.sub.initial) (the total predicted
number of stages) a process is performed before the search (in planning
block P13 in FIG. 30), as shown in FIGS. 45 and 46. A first example
workpiece is illustrated in the top portion of FIG. 45, and a second
example workpiece is illustrated in the bottom portion of FIG. 45. In the
first example workpiece, a total of four bends are to be performed, and
the workpiece is to have a total of five faces after the bends are
performed. In the second example workpiece, a total of four bends are to
be performed, and the workpiece will have a total of five faces after the
bends are performed. In order to assist in the prediction of the total
amount of stages which will be needed to perform the bends, a bend "test
strip" 370 is laid across each bend line of the 2D representation of the
workpiece. In each of the examples shown in FIG. 45, such a bend "test
strip" 370 is laid across the bend line which is darkened.
[0311] FIG. 46 illustrates an example flow chart of the steps that may be
performed in order to determine the initial tooling h-cost
(h.sub.initial), which is the total number of predicted stages needed to
perform all of the bends on the workpiece. In a first step S216, a first
stage length which is equal to the length of the longest bend line is
placed within the set of assigned stages. Thereafter, a test is performed
for each bend line, by performing step S218 and the steps following step
S218 for each bend. In step S218, a determination is made as to whether
or not an extra stage is needed. This is done by placing a narrow "test
strip" across the bend line in the manner illustrated by the examples
shown in FIG. 45. If a difference value, equal to the total number of
faces after placing the test strip over the bend line minus the total
number of faces before the test strip, is less than or equal to 3, then
no extra stage is needed. Otherwise, an extra stage is needed. In a next
step S220, if an extra stage is needed (i.e., predicted), the longest
stage (from the stage list) that can be used to perform the bend being
tasted is assigned, i.e., placed in the set of assigned stages. Then, a
determination is made in step S222 as to whether the newly assigned stage
is equal to a stage already in the set of assigned stages. If the newly
assigned stage is already in the set of newly assigned stages, the newly
assigned stage is not appended to the set, as indicated in step S226.
However, if it is not already in the set of assigned stages, the newly
assigned stage will be appended to the assigned stage set in step S224.
Thereafter, the process returns from either of steps S224 and S226 to
step S218, if therefore additional bend lines which need to be evaluated.
Once all the bend lines have been evaluated by the process, the process
proceeds to step S228, where the initial tooling h_cost is set to the
product of 600 and the predicted number of stages (which is the total
number of stages which have been placed in the set of assigned stages).
[0312] Applying the process steps as shown in FIG. 46 to Example 1 of FIG.
45, the faces after placement of the test strip along the bend line are
equal to 8, and the number of faces before the placement of the test
strip along the bend line is equal to 5. Thus, 8-5=3, and no extra stage
is predicted. In Example 2 shown in FIG. 45, the number of faces after
the test strip is placed over the bend line is 10. 10-5=5, which is
greater than 3. Accordingly, an extra stage is predicted for Example 2.
[0313] FIG. 47A illustrates a tool selection process overview which forms
part at the tool profile selection planning block P11 in FIG. 30. The
process begins at the bend sequence planner in step S471, and proceeds to
the tooling expert (tooling module) which operates in step S472. In
response to receipt of a "PLAN" command in FEL from the bend sequence
planner, the tooling expert forwards the part's geometric model,
bend-graph data, and a tool library to a tool filter module. In step
S473, the tool filter module determines a selected die, die-holder,
die-rail and a list of feasible punches. In determining such information,
the total filter module performs several steps for each bend to be
performed an the workpiece as indicated by the bend-graph data. The tool
filter module reads necessary data for the bend, and selects the die,
die-holder, and die-rail based upon tonnage, V-width, angle and
inside-radius requirements. The tool filter module then prunes the list
of punches (to form a list of feasible punches) based upon tonnage, tip
radius and tip angle constraints.
[0314] The process then returns to the tooling module in step S473, which
then forward the part's geometric model, bend-graph data and a list of
feasible punches to a profile select module. Then, in step S474, the
profile select module selects the punch and punch holder to be utilized
by the bending apparatus. In performing the profile selection, for each
bend, the profile select module selects only those punches from the
feasible list whose profile matches the geometry of the part. Punches
with matching profiles will not collide with the part during the bending
process. The profile select module then selects the best punch and
punch-holder accordingly. The appropriate selected punch and punch holder
are then returned to the tooling module which continues its functions at
step S475.
[0315] A more detailed explanation of the algorithm performed by the tool
filter module will now be provided. In a first step, the tool filter
module reads the following data: the desired inside radius (IR) of each
bend; the part material thickness (T), the part material tensile
strength; the minimum adjacent flange length (the minimum/preferred
minimum length (height) of the shorter flange which runs along the bend
line of the particular bend of concern); the bend length and bend angle;
and a tool library (the tool library includes inverted profiles of the
punches which can he used).
[0316] In a second step, for each bend, the tool filter module performs
the following steps:
[0317] (a) A list of FEASIBLE_DIES is set to empty.
[0318] (b) The list of available dies in the library is scanned, and for
each die:
[0319] if its v-width can produce the desired IR within some tolerance,
and if its v-angle closely matches the bend angle, and if the
tonnage-per-meter required for this v-width and T (competed using a bend
force chart and tonnage equations), is within the tonnage capacity of
this die,
[0320] then, add this die to FEASIBLE_DIES.
[0321] It is noted that the tonnage-meter requirement for the v-width and
T may be computed using a force chart and tonnage equations provided by
Amada in their press brake tooling catalogues. In addition, or in the
alternative, the tonnage-per-meter value may be calculated using the bend
chart and tonnage equations provided in the text entitled "New Know-how
on Sheet-Metal Fabrication Bending Technique," written by the Amada Sheet
Metal Working Research Association, Machinists Publishing Company, Ltd.,
First Edition (May 15, 1931), the content of which has-been incorporated
by reference herein in its entirety.
[0322] (c) The die is selected from FEASIBLE_DIES, which most closely
satisfies the IR, bend angle, the minimum flange, and total tonnage
requirements. If the minimum flange length constraint is still not
satisfied, then a warning is issued. The appropriate die-holder and
die-rail for the selected die are then selected for the selected die.
[0323] (d) The list of available punches in the library is then scanned,
and for each punch:
[0324] if the tip angle is less than but close to the selected die's
v-angle, and if the tip radius is less than and close to the ER, and if
the tonnage-per-meter required for this bend is within the tonnage
capacity of this punch,
[0325] then this punch is added to the, list of FEASIBLE_PUNCHES, for this
bend.
[0326] A more detailed explanation of the seeps performed by the profile
select module will now be provided.
[0327] In an initial step performed by the profile select module, for each
bend, the final (finished) 3D model of the part is aligned in relation to
the appropriate tooling in a position in which it would be in the bending
press after completion of the bend being evaluated. Then, for each bend:
[0328] (a) The list of FEASIBLE_PUNCHES is scanned for this bend, and for
each punch, if the 3D geometric model of the punch does not intersect the
3D geometric model of the part at the end of this bend, then this punch
is a FEASIBLE_PUNCH for this bend. The 3D part model is a sufficient
condition, but may be over constraining and may be modified at a future
date. For example, intermediate part models, representative of the actual
shape of the part at each bend in the sequence could be used as the
profile selection is performed throughout the search process being
performed by the bend sequence planner.
[0329] (b) The punch is selected among the FEASIBLE_PUNCHES, which most
closely satisfies the IR, bend angle, and tonnage requirements. The
standard "robot-tooling" punch will be selected if feasible. It is noted
that the selected punch may have to be used with its profile inverted
(i.e., inverted in the Y direction/rotated around the Z axis by
180.degree.), in order to satisfy the intersection test in step (a) above
of the profile selection module.
[0330] It is noted that one or both of the tool filter module and profile
selection module calculations may be performed either before, during or
after the search is performed by the bend sequence planner.
[0331] FIGS. 47B-47C illustrate a stage planning process which pick a
stage and a location along the stage at which the workpiece will be
loaded when performing a particular bend in the bend sequence, such
planning being indicated in block P14 of the dialogue dialogue shown in
FIG. 30. In a first step S230, an intermediate part model of the part is
formed (with the part having the bends up to the present bend in the bend
sequence).
[0332] In step S232, the biggest non-evaluated stage is chosen from the
stage list (of available stages). Then, in step S234, the present bend in
the search is simulated with tooling expert (TE) collision checking, with
the part being loaded at onto the tooling stage at a center position with
respect to the stage. Then, in step S236, a determination is made as to
whether or not there was a collision during simulation of the bend. If
there was a collision, the process proceeds to step S238, where the bend
being evaluated in the search is simulated with TE collision checking
while the part is loaded at the left side of the tooling stage, with the
left end of the bend line being placed just to the left of the left side
of the tooling stage. If a collision is then determined in step S242, the
process proceeds to step S246.
[0333] If, however, a collision is not determined to have occurred in step
S236, the position at which the workpiece will be loaded onto the stage
is set to the center position in step S240, and the process proceeds (via
connector B) to step S254 which is shown in FIG. 47C.
[0334] If a collision is not determined in step S242, after simulating the
bend with the part positioned on the left side of the stage, the process
proceeds from step-S242 to S244, where the position for loading the
workpiece. On the stage is set to the left position. Then the process
proceeds directly to step S254 (via connector B).
[0335] In stem 5246, the bend is simulated with TE collision checking with
the part positioned at the right side of the tooling stage (e g., as
shown in FIG. 48B), with the part being placed an a tooling stage so that
the right end of the bend line is placed just to the right of the tooling
stage while the bend is performed if a collision is determined to have
occurred during this simulation, the process proceeds to step S252. If no
collision occurred during this simulation as determined in step S248, the
process proceeds from step S248 to step S250, wherein the loading
position is set to the right position, before the process proceeds to
step S254. If a collision did occur as determined at step S248, the
process proceeds to step S252, wherein the chosen stage (chosen in step
S242) is disregarded, and the process proceeds (via connector C) to step
S232 at the top of FIG. 47B. It is noted that the next non-evaluated
biggest stage from the stage list will be chosen in step S232 at this
point. However, the stage planning process may be designed so that it
will go from a "failed" biggest stage straight to a stage having a length
approximately equal to the bend line of the particular bend being
evaluated.
[0336] In step S254, the evaluated stage is deemed a solution stage.
Thereafter, in step S258, the stages are arranged along the die rail, and
in step S256, the necessary left-right clearances for stage
juxtapositioning are computed.
[0337] The above-referenced tooling expert (TE) collision checking
process, referred to in each of steps S234, S238 and S246, may be
performed as follows:
[0338] The tooling expert collision checking comprises mainly an
intersection determination. The intermediate part corresponding to the
particular bend being evaluated in the search is formed, and is further
converted to a B-rep (boundary representation) which is compatible with
the NOODLES geometric modeler. Then, an intersection is performed
utilizing the appropriate NOODLES function. First, the number of faces of
the part, as it changes shape throughout performance of the bend, are
monitored. For each of a plurality of discretized shapes of the part
throughout performance of the bend, each of these shapes are intersected
with the appropriate
tools of the bending workstation during the
performance of the bend. The resulting number of faces of the part, for
each shape, is then counted. If the resulting number of faces,
intersected with the tools, is greater than the expected number for that
shape, then there has been a collision.
[0339] The above-described steps define a preferred algorithm for
performing a tooling expert collision checking process. In the
alternative, the intermediate part before and after the bend may be
modeled by a bounding box, and the basic solid intersection function
provided by NOODLES may be utilized to determine if the tools intersect
with the bonding box representation of the workpiece for the particular
bend being evaluated during the search.
[0340] A description will now be given of a process for determining the
necessary left-right clearances for juxtapositioning the stages along the
die rail, as computed in step S256 of the process illustrated in FIGS.
47A-47B. The lateral limits of the part at the particular bend being
evaluated are calculated based upon the amount by which the workpiece
extends beyond a side edge of the solution tooling stage, and a largest
lateral limit for each side of the stage is determined. The stages
arranged adjacent to the present solution stage are then appropriately
spaced to have a gap between the adjacent side edges which is greater
than or equal to the larger of the determined largest lateral limits of
ate adjacent side edges.
[0341] In arranging the stages, in step S258 of the stage planning process
shown in FIGS. 47B-47C, the present solution stage (corresponding to the
presently evaluated bend) is placed in the middle of the die rail if it
is the longest solution stage that has been evaluated so far in the
search. On the other hand, if it is the shortest stage that has been
decided upon at the present point in the search, then it is placed at the
first or left position along the die rail. All middle gradations, roam
the second largest down, are respectively positioned from the third
position to the last position along the die rail, the third position
being positioned just to the right of the middle position, and the last
position being the position furthest to the right.
[0342] Additional considerations must be taken into account by the bend
sequence planner to arrange the layout of the stages when co-linear bends
are to be performed simultaneously in performance of the operation
sequence. There are issues which must be taken into account, such as the
clearance of the part with respect to the stages when the co-linear bend
is being performed, and the sizes, arrangement, and number of stages that
are needed in order to accommodate the co-linear bend while at the same
time best using the resources at hand. One particularly important
resource that must be conserved is the use of space along the die rail in
order to set up the stages. The number, sizes, and spacings of the stages
may be limited because of limitations in die rail space.
[0343] When planning the staging for performance of a particular co-linear
bend, a decision should be made as to whether the co-linear bend can be
done with only one stage, or whether two spaced stages are needed in
order to allow clearance therebetween. Accordingly, the tool expert
should consider whether the co-linear bends are interrupted (as is the
case in FIG. 20E) or non-interrupted (meaning that one stage can be used
for bath bends, as is the case in FIG. 20D)
[0344] A search algorithm could be used, such as A*, in order to come up
with an appropriate stage layout that can accommodate co-linear bends,
while minimizing the number of stages and the spacing between stages that
are needed. A significant cost to be taken into account by such a such
algorithm is the total length of the die rail, the amount of space along
the die rail a certain staging solution will occupy, and amount of space
along the die rail remaining at the present level of the bend sequence
(being generated by the bend sequence planner).
[0345] FIGS. 48A-48C illustrate respective intermediate representations of
a workpiece, being modeled in relation to the tooling during performance
of a bend. In FIG. 4B, the workpiece is at a right position along the
stage. In each of FIGS. 48A and 48B, the bend line is shorter than the
length of the tooling stage. In FIG. 48C, the workpiece centered along
the tooling stage, where the bend line is slightly longer than the length
of the tooling stage.
[0346] In each of the graphic representations shown in FIGS. 48A-48C, the
various components of the bend press are modeled, including the tool
punch and the die, along with an intermediate representation of the
workpiece.
[0347] FIG. 49 illustrates a fine motion planning process, which may be
performed in planning block P14 of the dialogue chart shown in FIG. 30.
In a first stem S260 of the process illustrated in FIG. 49, parameters
are set and initialization steps are performed. In this regard, the 3D
models of the tooling and the part are read, and various initialization
functions are performed. The goal parameters are set up based upon the
tool and part geometry, and the desired clearance. In addition, the
portion of the part inside the bend line is rapidly analyzed, and a
bounding box that surrounds the part is computed.
[0348] In step S262, a determination is made as to whether or not a simple
solution path is readily available, by testing if the to a of the part
can clear the bottom edge of the tooling punch, and if certain features
of the part satisfy constraints imposed by the tool geometry and the die
opening. If such a simple solution path is readily available, the process
proceeds to step S264, where a fine motion plan is quickly generated. The
process is then forwarded to step S270 where it returns to the tooling
expert with the sine motion plan and the fine motion cost, which is equal
to the amount of time that it takes to unload the part from the bend
press.
[0349] If a simple solution is not available as determined at step S262,
the process proceeds to step S266, in which a modified A* search is
performed. In performing the search, a plurality of feasible virtual
configuration space nodes are generated and placed on the OPEN list with
their respective costs. The first level of the search includes several
generated intelligent direction feasible VC (virtual configuration) space
nodes that were appended to the OPEN list. When a node from the OPEN list
is expanded, it is expanded to include several neighborhood nodes
representative of locations in the general neighborhood of the parent
node. Each expanded node is tested for feasibility by utilizing a
geometric intersection test. If the test is positive (i.e., there is no
collision by the use of a negative intersection function), the expanded
node is appended to the OPEN list along with its cost. The cost is an h
cost which is set equal to the Euclidean distance from the expanded node
to the goal. The nodes on the OPEN list are continually expanded to lower
levels in the search tree until the goal is reached or until the OPEN
list becomes empty.
[0350] At step S263, a determination is made as to whether or not the goal
was reached. If the goal was reached, the tine motion planning process
returns to the tooling expert with the fine motion costs and the fine
motion plan in step S270. If the goal was not reached, the process
proceeds to stem S272, where the fine motion cost is set to infinity, and
is sent to the tooling expert.
[0351] FIG. 50 illustrates an example process for determining the motion
expert k and h costs, as indicated in planning box P21 of the dialogue
chart shown in FIG. 31. In a first stem S274, the k cost is calculated to
be equal to a calculated robot travel time to take the part from a
position at a stage of an immediate preceding bend to the stage location
corresponding to the presently evaluated bend in the search, without
regard to collisions. Then, in step S276, the h cost is calculated to be
equal to the product of the running average of the k cost values for the
previous bends and the presently evaluated bend, and the sum of the
number of remaining bends and twice the number of remaining predicted
repos that will have to be performed before all of the bends in the bend
sequence are completed.
[0352] In forcing the gross motion scheme and the gross motion paths after
the search is performed, as indicated in planning block P22 of the
dialogue chart shown in FIG. 31, a state-space search algorithm,
particularly an A* algorithm, may he performed to form each of the steps
along the path from one point to another in order to bring the workpiece
throughout its various stages in the bend sequence. When generating a
path from an initial start position to a goal position, for a particular
operation of the bend sequence, before deciding that the path will be the
final path to be used, collision checking may be performed. In order to
perform this collision checking, the workpiece, the robot, and the bend
press may each be modeled, and intersection tests may be performed using
the appropriate NOODLES functions. FIG. 51 illustrates a geometric model
of a press brake 304, a workpiece bounding box 300, and a robot 302. In
performing collision checking in connection with the gross motion
planning, the workpiece is modeled by a bounding box 300. In FIG. 51, the
position of the robot 302 and the modeled part 300 is shown in three
positions extending between a stage used for the final bend of the bend
sequence to a position at the far right of the diagram which corresponds
to a position ready for unloading by the loader/unloader.
[0353] 4. Geometric Modeling
[0354] Each module of planning system 71 utilizes geometric modeling
functions in order to analyze the physical relationships between various
components of the bending workstation and the workpiece as it is being
moved and developed. Such geometric modeling functions may include
representing stock, intermediate, and final parts, checking for
interferences during motion planning and assisting in selecting robot
grip positions. In addition, needed geometry information may be provided
to assist the sub-planners in determining punch geometry selection, tool
placement, loader/unloader suction cup 31 placement, and interpretation
of sensing signals. Simplified geometric representations may be provided
for fast computations (e g., bounding boxes, convex hulls, and 2D
cross-sections), which may be needed to perform geometric-based reasoning
methods (e.g., oct-tree representations, and configuration spaces). A
geometric database of physical components may be provided which includes
both symbolic descriptions (e.g., labeled features) along with actual
geometry data of physical components. Other geometric modeling functions
may be provided, although they are not specifically enumerated herein.
[0355] In a particular embodiment of the present invention, NOODLES is
utilized to perform many of the noted modeling functions. Several reasons
may be given for using NOODLES to implement the geometric modeling
functions. NOODLES includes a large package of geometric routines and is
accessible to C/C+C++ source code. In addition, NOODLES is capable of
handling non-manifold geometry (e.g., 0D, 1D, 2D, 3D, etc.) with the same
routines, and has a hierarchal structure which can be used to build
geometry libraries and to store various types of information regarding
features of parts.
[0356] A modeling mechanism (not shown) nay be provided for modeling both
upper and lower surfaces (i.e., the thickness) of each sheet metal
workpiece throughout one or more of the design, planning, and execution
phases of the bending process. It may be useful to have such a complete
thickness representation in the workpiece for certain aspects of the
system. For example, holding expert 82 may benefit from the added
knowledge of knowing both the upper and lower surfaces of the workpiece,
and motion expert 84 may be able to better plan for and control fine
motion of the work piece when it is close to the die and punch tool
before and after a bending operation.
[0357] Referring to FIG. 10, an upper/lower surface modeling mechanism
(not shown) performs a thickness transformation between a flat
representation 114 and a representation with thickness 116, shown at the
right of FIG. 10. Essentially, the representation with thickness 116
comprises two flat representations juxtaposed one on the other.
[0358] FIG. 11 illustrates an overlapped flange 118 modeled as a flat
representation 114 at the left of FIG. 11, and transformed to a
representation with thickness (i.e., a solid model). Solid model 116 is
shown to be equal to an upper surface representation 120 together with a
lower surface representation 122. Upper surface representation 120 is
shown in solid lines, and lower surface representation 122 is shown in
dotted lines.
[0359] FIG. 12 represents an exemplary tree structure which may be
utilized to model the design representation of a sheet metal workpiece
16. At a first level, a plurality of shapes 126 are indicated
corresponding to workpiece 16. For each shape 126, several faces 128 are
defined, and for each face, several edges 130 are defined. For each edge,
a plurality of vertices 132 are indicated. For each vertex, a 2D (i.e.,
stock part) representation 134 may be maintained, along with a 3D (i.e.,
final part) representation 136 and an intermediate representation 13.
[0360] A thickness transformation may be performed, as represented by
arrow 140, resulting in upper and lower surface representations 142, 144,
which each have a tree structure similar to that illustrated above the
line in FIG. 12.
[0361] FIGS. 17A-17B and 18A-18B illustrate several different types of
geometric libraries which may be provided in order to aid in the
performance of geometric modeling of the system.
[0362] For further information regarding the NOODLES modeling system, and
geometric modeling in general, reference is made to the Reference Manual
for the Noodles Library, by E. Levant Gursoz, EDRC, Carnegie Mellon
University, Pittsburgh, Pa., and a back by Michael E. Mortezison,
entitled Geometric Modeling. The contents of each of these documents are
expressly incorporated herein by reference herein in their entireties.
[0363] 5. The Query-Based Module Communicating Language (FEL)
[0364] In order to formalize the interface between each of the modules of
the planning system, a query-based language called FEL may be used. FEL
was originally developed by David Bourne in 1988, and has since been
further refined. For more detailed information regarding FEL generally,
reference should be made to the several user guides provided by the
Robotics Institute at Carnegie Mellon University including: "Feature
Exchange Language Programmer's Guide." David Alan Bourne, Duane T. Willis
(Jan. 14, 1994); "Using the Feature Exchange Language in the next
Generation Controller," David Alan Bourne, Duane T. Williams,
CMU-RI-TR-90-19; and "The Operational Feature Exchange Language," David
Alan Bourne, Jeff Baird, Paul Erion, and Duane T. Williams,
CMU-RI-TR-90-06. The contents of each of these FEL documents are hereby
expressly incorporated by reference herein in their entireties.
[0365] FIG. 19 illustrates an exemplary F-L planning message 145 which is
being sent from bend sequence planner 72, as is indicated by expression
146, to motion expert 84, as indicated by expression 148 FEL planning
message 145 comprises a query command sent from bend sequence planner 72
to motion expert 84, which provides preliminary information to motion
expert 84 so that it may satisfy the query. An initial parameter
setting-portion 150 of message 143 is provided immediately after a main
verb/command "get" 152, and includes expressions "type message" 147,
"from planning" 146, "to moving" 148, and "state request" 149. The
expression "type cost" is provided immediately after setting portion 150,
and signifies that a request is being made for the motion expert to tell
the planner how much a particular operation will cost. The next
expression "bends . . . " 156 queries how expensive it will be to perform
bend number 3, after having done bend number 6. The numbers 7 and 1
represent a face of the workpiece that will be inserted into the die
space of the bending workstation for bends 6 and 3, respectively.
[0366] A next expression "average_cost 2-321" 158 informs the motion
expert that this is the average cost (k-cost) for motion per bend for the
bends that have previously been done based upon cost values previously
assigned by the motion expert. In this case, the average cost is 2.321
seconds per bend previously performed. A next expression
"flange-before_bend" 160 indicates the height (in millimeters) of the
tallest flange of concern (indicated in FIG. 18A as 11 millimeters) to be
used by the motion expert to make clearance determinations. Expression
"flange_after_bend" 162 similarly indicates the height (in millimeters)
of the tallest flange of concern which will exist after the bend is
performed (indicated in FIG. 18 as 17.5 millimeters) A next expression
"robot_loc" 164 informs the motion expert there the part is by specifying
the location of the robot (as it was left upon completion of the previous
bend). A last expression in the planning message 145, "bendmap" 166,
indicates the respective tool stages for the previous bend and presently
proposed bend and where the workpiece should be with respect to the stage
for each bend. The first value 168 represents that the location
information is given for bend number 6, and a second value 170 indicates
the stage at which bend number 6 was performed, which in this case is
stage number 1. Several coordinates are listed to the right of the first
and second values 163, 170. The first coordinate value "257." represents
the position of the left edge of the part with respect to the left edge
of the stage, and the second coordinate value "-257" represents the
position of the left edge of the part with respect to the stage. The
value "350.7" represents the position of the right edge of the part with
respect to the stage. The final value "320." represents the position of
the stage along the die rail with respect to the left edge of the die
rail.
[0367] Generally speaking, the planning message 145 forwards all the
information which the motion expert will need in order for it to generate
a subplan for moving the workpiece from an initial position (where it is
left after performance of a preceding bend) to a position ready for a
proposed next bend.
[0368] A significant feature of the query-based interface structure
between the planner and its various sub-planners (experts) is that when
the planner forwards a query to am expert, it informs the expert of all
background information that the expert will need to respond to the query.
Thus, the experts need not save information, but can simply respond to
the bend sequence planner and return al related information for the bend
sequence planner to save.
[0369] (a) Configuration of FEL-Based Process Planner
[0370] In configuring the process planner 71 illustrated in FIG. 5, each
module including bend sequence planner 72, and experts 80, 82, and 84, is
sent a command to read its startup configuration file. An example of such
a command could be as follows:
[0371] (read((type file (name "config.s 2.fel")))
[0372] ((type message)(from planning)(to tooling)(name "config")))
[0373] After each module has read is startup configuration file, the
system will be set so that bend sequence planner 72 can use any specified
number of experts, e.g., using a command such as the following:
[0374] (set((type experts)(experts(tooling grasping moving))))
[0375] After the experts to be used by bend sequence planner 72 are
specified, the part design may then be read from C-D system 74 into each
module as needed, and bend sequence planner 72 may start the planning
process.
[0376] (b) FEL Commands
[0377] The following table lists several commands that may be specified by
bend sequence planner 72 in participating in a dialogue with the other
modules of the system, including the experts.
1
FEL MODULE DIALOG COMMANDS
SEARCH COMMANDS
Finalize collect final plan info from each module
Get get cost information (and other data) for a
bend
Plan initialize a module for planning a part
USER COMMANDS
Quit cleanup and exit a module
Read read files for planning
Set set various module options
Show show various module
data to user
[0378] The following table lists several commands that may be specified by
bend sequence planner 72 for execution by sequencer 77.
2
FEL SEQUENCER COMMANDS
Print
print messages for BM100 operator for
Messages setup
Programs download programs to NC9R press
controller and backgage
controller
Startup initialize state of press and robot
Get acquire part from various steps of the
process
Put
load part into various steps of the
process
Move move
the robot through a series of
points
Bend initiate bend
sequence (backgage and
bending)
[0379] The `read` command may be used to instruct a module to read certain
files needed for planning, the files being representative of the design
to be produced, and to configure itself in accordance with the design.
With use of the "set" command, various module functions may be set, e.g.,
how to display information, how to interface with other modules, and so
on. The `show` user command may be utilized to show various module data
to the user, erg., the various nodes of the A* algorithm which represents
the various costs or different bends within the proposed bend sequence.
[0380] 6. Part Design and Modeling
[0381] In the illustrated embodiments shown in FIG. 5A, a C-D system 74
performs several functions relating to part design and part modeling for
planning system 71 CAD system 74 allows a user to form a design of a
given workpiece by working with simplified, primitive components (in
either 2D or 3D form) on a graphic interface, each primitive component
having certain desired dimensions which may be input by the user, in
order to design the workpiece. The user may then utilize a user interface
with CAD system 74 to connect the primitive components and, in addition,
to remove portions, such as holes, slots, etc., from the connected
primitive components. CAD system 74 may then perform feature labeling
functions including labeling several geometric features of the workpiece,
such features having a particular significance in the context of sheet
metal bending. CAD system 74 may also build a bend graph which associates
various bend-related information with the geometric design of the
workpiece CAD system 74 thereby forms an output file which includes
geometric, topological, and bend-related feature information (including a
list of labeled features and a bend graph). All of this information is
then placed into an output shape file which will form the basis of
communication with other modules of planning system 71. In this regard, a
part modeler may be provided to form an interface between the design
system's output shape file and the various expert modules 80, 82, and 84
(and 85) along with bend sequence planner 72.
[0382] A part modeler may be provided which performs various conversions
on the data provided in the output shape file in order to form developed
part data structures which can be used for geometric modeling purposes by
each of the modules of planning system 71. Part modeler may be
implemented in the form of a library which is accessible to each of the
modules in planning system 71, which may be utilized to manipulate the
information in the developed part data structures and/or undeveloped data
structures provided in the output shape file, in order for the various
modules to utilize the information provided therein to serve any
particular purpose that they may be addressing at a particular point in
time.
[0383] FIG. 13A illustrates a functional black diagram of a design system
311 which may be provided to perform the functions of CAD system 74 of
the illustrated embodiment. Design system 311 performs several
design-related functions which may be implemented in the form of function
modules as illustrated in FIG. 13A. Each function module may be
implemented by a particular function prided in a library of functions
comprised by the design system. The functions shown in FIG. 13A include a
user interface 312, file I/0 314, view 316, simulation 318, shape
defining 320, hole defining 322, editing 324, and feature labeling 323.
Each of these functions may be controlled by a design system control
module 326. In order to perform several feature labeling functions, bend
graph module 330 and bend deduction module 332 are each connected to
feature labeling module 328.
[0384] Each of the functions are illustrated in FIG. 13A in the form of
function modules. However, it is not necessary that each of these
functions be separated into separate modules in the specific manner as
illustrated. In the alternative, an overall program or hardware system
may be provided which allows each of these functions to be performed
without having any specific interface with other functions of the design
system. For example, one complete routine may be provided within a
processor of a computer to implement each and every one of the functions
of the overall design system, without removing several of the general
benefits provided by the design system disclosed herein.
[0385] The file I/O module 314 performs functions such as reading,
writing, printing, and performing data exchanges between modules. The
view function module 316 performs functions such as zooming in/cut, and
panning during display of the part an a graphic interface. The shape
module 320 is provided to allow a user to specify particular shares,
including rectangular shapes, angles, a Zee, a box, a hat, and so on,
which may be put together to form a particular workpiece design. Hole
module 322 is provided for the user to specify various type of cavities
to be provided in the workpiece, such as cutouts, holes, slots, notches
and so an, to further allow the user to design the workpiece in a manner
similar to that provided by shape module 320. Edit module 324 is provided
to allow the user to perform various editing functions such as a fillit
function, a chamfer function, and changing the workpiece material type
and/or thickness. Simulation module 318 is provided so that the user can
is simulate bending and unfolding of various bends on the workpiece, thus
to get a visual representation of such bends on the graphic interface to
be utilized by the design system.
[0386] Feature labeling module 328 is provided to automatically assign
feature labels which pertain to sheet metal bending, and which will thus
be useful to the planning system 71 illustrated herein in forming or
generating a bend sequence plan with the use of such feature labels.
Feature labeling module 328 may generate feature-related information such
as corners, setbacks, form features (e.g., dimples, louvers), holes,
large radius bend, etc. In addition, feature labeling module 328 may be
designed so that it directs a bend graph module 330 to farm a bend graph
which includes information organized in a certain way to relate the
geographic and topological information to the various bends to be
performed on the 2D workpiece to form the desired 3D finished workpiece.
In addition, feature labeling module 328 may be designed so that it
directs the performance of bend deduction calculations by a bend
deduction module 332. The resulting bend deduction information may then
be placed within a Bend graph listing provided by bend graph module 330.
[0387] Various modules provided in the planning system 71 illustrated
herein perform various geometric modeling functions which require that a
part (i.e., a workpiece) be modeled. Accordingly, a part modeler should
be provided, and may be provided in the form of a library of functions
accessible to the various modules in order to interface between the
design system's output shape files and the various modules within
planning system 71. FIG. 13B illustrates a part modeling system 333 for
performing this function. Part modeler 333 includes two main function
modules: a B-REP rearrangement module 336 and an intermediate shape
conversion module 342. The B-REP rearrangement module 336 converts an is
undeveloped part data structure 334 to either or both of a developed 3D
part data structure (in B-REP) 338 and a developed 2D part data structure
(in B-R) 340. Intermediate shape conversion module 342 converts the
developed 2D part data structure (in B-REP 340) to a developed
intermediate part data structure (in B-REP) 344.
[0388] The undeveloped part data structure 334 (provided by the design
system 311 as illustrated in FIG. 13A) defines a geometric/topological
data structure that does not take into account bend deduction and that
forms part of the output shape file produced by CAD system 74. A
developed part data structure, such as developed 3D part data structure
338 and developed 2D part data structure 340, includes a modified
representation of the part that takes into account bend deduction. The
noted developed part data structures are further converted to be in the
form of a boundary representation (B-rep) model.
[0389] The data structure which resides in the shape output file produced
by the CAD system may be designed to include a shape header which
includes part information, followed by a plurality of shapes in a linked
list, the linked list ending with a null. In each shape, topological and
geometric information may be provided for both a 3D and a 2D
representation of the part. The structure of the shape may include a list
of information including the shape type, shape identification, a face
list, an edge list, a 3D vertices list, and a 2D vertices list. Each face
may have its own structure, which may include a list of information
including a face identification, the number of vertices of the face, a
vertices list for the vertices of the face, and a face normal vector. For
each edge, a structure may be provided which includes information such as
the edge identification, the edge type, the bent line type, and the
vertices index number for that particular edge. For each vertex,
information may be provided including the vertices identification,
vertices coordinate, 2D coordinates, 3D coordinates and intermediate
coordinates. Further information regarding the details of data structures
and the illustrated CAD system in general are provided in an ME report
dated May, 1992 entitled "A Parallel Design System for Sheet Metal Parts"
presented by Cheng-Hua Wang at the Mechanical Engineering Department,
Carnegie Mellon University, Pittsburgh, Pa., the contents of which are
expressly incorporated by reference herein in its entirety
[0390] As noted above, the CAD system preferably employs a concurrent
"parallel" representation of both the 3D and the 2D versions of the part
as it is being designed, and such representations are maintained once the
part is finally designed for use by planning system 71. In order to
demonstrate one of the benefits associated with having such a concurrent
and parallel maintenance of 3D and 2D data representations, FIGS. 13C and
13D are provided. One of the benefits of having a concurrent and parallel
design system is that such a system resolves ambiguities which may
other-wise occur in the design process. For Rumple, a 2D part 346a is
illustrated in FIG. 12C and a 3D part 346b is shown in FIG. 12D. By
viewing just the 3D representation of 346b of the part, one may not
notice that inner tab 347 is too long, and cannot possibly be formed from
a single, malleable piece of sheet metal. This is only clearly evident by
viewing the 2D representation 346a of the part, which illustrates the
overlap of inner tab 347 as it crosses an inner edge portion 348 of the
part. Accordingly, as can be seen in FIGS. 13C and 13D, by having both
the 2D and the concurrent 3 representations in a graphic form, the
designer can easily resolve ambiguities and recognize errors in the
design which might otherwise be detected due to ambiguities in just
viewing one or the other of the 2D and 3D representations during a
design. Another benefit associated with such a concurrent design
approach, as noted above, is that it may be easier to make modifications
to one representation (e.g., the 2D representation) instead of the other
for a particular type of modification, e.g., adding an inner tab to the
part.
[0391] FIGS. 14A-14E illustrate a design system graphical user interface
348, with its display changing throughout the process of designing a
certain desired part. Ref erring, e.g., to FIG. 14A, graphical user
interface 348 includes a key pad 350, a parameters window 352, a
primitive shape 3D window 354, a primitive shape 2D window 356, a model
3D window 358 and a model 2D window 360. FIG. 14A shows the first
introduced primitive shape provided on a graphical interface 348 in order
to produce the desired workpiece as shown in FIG. 14E. The first
primitive shape is a box. The parameters of the box may be specified with
the use of key pad 350 and are illustrated in parameters window 352 to
have a base which is 100.times.100 (indicated by parameters PC[1] and
P[2]), and a height equal to 20 (indicated by parameter [3]). The 3D
version of the primitive shape is illustrated in primitive shape 3D
window 354, and the 2D shape of the primitive shape is illustrated in
primitive shape 2D window 356. Since this is the first primitive shape
being provided for the part design, model 3D window 358 is identical to
primitive shape 3D window 354, and model 2D window 360 is identical to
primitive shape 2D window 356.
[0392] FIG. 14B illustrates the next shape to be added which is a
rectangle having a length of 100 (indicated by parameter [1]), and a
width of 15 (indicated by parameter [2]). The next primitive shape being
added to design the part is another rectangle having the same parameters
as the rectangle of FIG. 14B. The next primitive shapes are added to the
workpiece as shown in FIGS. 14C, 14D and 14E.
[0393] It is noted that for each primitive shape which is added to the
workpiece, a dotted line is utilized to indicate a bend line. Parameter
P[1] corresponds to the X dimension, P[2] corresponds to the Y dimension,
and parameter P[3] corresponds to the Z dimension of the primitive shape
being added.
[0394] FIGS. 15A-15C are provided to illustrate bend deduction, and the
manner in which it relates to the 3D and 2D dimensions of flanges of a
workpiece. Where a workpiece 362 has a thickness t, and the flanges of
the workpiece 362 are desired to have lengths a and b, a calculation
should be performed so that the flat 2D representation of the part, when
bent along the appropriate bend line, will indeed form the flanges having
appropriate dimensions a and b, taking into account the thickness t of
the material, the material type, and the internal radius of the bend line
(to the inside surface of the sheet metal). Starting with an undeveloped
representation 363 of workpiece 362, the developed 2D representation 364
of workpiece 362 may be calculated by subtracting the appropriate bend
deduction (BD) value from the overall dimension a+b. Methods for
performing such a calculation are known manner. Accordingly, no specific
details are given herein regarding the equation used for determining the
bend deduction (BD) value.
[0395] FIG. 16 illustrates a graphic representation of a bend graph, the
graphic representation being a 2D representation of the workpiece
designed in the steps illustrated in FIGS. 14A-14E. The bend lines of the
designed workpiece are labeled as bend lines B1, B2, . . . B8, and each
label comprises a bend line index. Each bend line index is then assigned
a bend sequence number which comprises an initialization value. The bend
sequence number indicates the order in the bend sequence in which the
bend line will be bent, and is assigned for each bend line in accordance
with the plan (i.e., the bend sequence) produced by the bend sequence
planner of the illustrated planning system 71. In addition, to the bend
line indices, each bend line is assigned a bend angle. For example, in
the bend graph illustrated in FIG. 16, an angle or -90.0.degree., is
given for bend B2, and a bend angle of 90.0.degree. is given for B1. The
bend graph further comprises an indication of the various faces F1-F9
which are formed on the workpiece once the bends are performed
[0396] Listings are provided in Appendices A and B which respectively
include a geometric/topological data structure and a bend graph listing
for the part designed in FIGS. 13A-13E. In addition to the above-noted
report to the Mechanical Engineering Department of Carnegie Mellon
University, further reference may he made to an article by Cheng-Hua Wang
and Robert H. Sturges, entitled "Concurrent Product/Process Design with
Multiple Representations of Parts," IEEE (1993) 1050-4729/93, the content
of which is expressly incorporated by reference herein in its entirety.
[0397] 7. Sequencing and Control
[0398] FIG. 52 comprises a block diagram of the various software modules
and their main interfacing components, such modules including planner 72,
sequencer task 76, robot task 92, press and L/UL task 94 and backgage
tasks 96, speed control task 100, and collision detection task 100.
Planner 72 includes interfacing components such as an output queue 72a
and input queue 72b. The sequencer task 76 includes an input queue 76a,
an output queue 76b, a task response queue 76c and a section
corresponding to several task class member functions 76d. Output queue
72a of planner 76 is connected to input queue 76a of sequencer task 76.
Output queue 76b of sequencer 76 is connected to input queue 72b of
planner 72.
[0399] Robot task 92 includes an input queue 92a, an output queue 92b, and
a portion corresponding to robot task functions 92c. Press and L/UL task
94 includes an input queue 94a, an output queue 94b, and a portion
corresponding to press task functions and L/UL task functions 94c.
Backgage task 96 includes an input queue 96a, an output queue 96b, and a
portion corresponding to backgage task functions 96c. Each of input
queues 92a, 94a, and 96a is connected to input queue 76a of sequencer
task 76. Each of output queues 92b, 94b, and 96b is connected to task
response queue 76c of sequencer task 76.
[0400] The controller software structure shown in FIG. 52 is
representative only of an example of the inner connections between
planner 72, sequencer task 76, and control system 75, the structure of
each of the tasks, and how they are connected. It is within the scope of
the invention disclosed herein to provide variations of a control system
which performs the same essential controlling functions, without being
implemented in the manner illustrated in FIG. 52.
[0401] FIG. 53 illustrates an example flow of the process performed by
sequencer task 75 illustrated in FIG. 52. Once the sequencer is started,
in a first step S280, the sequencer will obtain a new message from the
FEL listing at input queue 76a. In step S282, the sequencer will parse
the FEL sentence, and in step S284, the sequencer will create a data
object for each task involved. In step S286, the appropriate data objects
will be placed upon their appropriate task queues (e.g., an one or more
of the input queues of robot task 92, press and L/UL task 94, and
backgage task 96). In stem S288, the sequencer checks the state of all
tasks involved. Thereafter, in step S290, a determination is made as to
whether all the tasks are finished. If not, the sequencer proceeds to
step S292. If all the tasks have finished, the sequencer proceeds from
step S290 to step S294 where appropriate cleanup operations are performed
(e g., destroying data objects and resetting flags).
[0402] If all the tasks have not finished as determined at step S290, in
the next step S292, a determination is made as to whether or not a time
out has been exceeded. If not, the process returns to step S288. If the
time out has been exceeded, the sequencer proceeds to step S293 where
appropriate error recovery processing is performed. After the cleanup
operations are performed in step S294, a determination is then made in
step S296 as to whether the task exit signal has been set. If the task
exit signal has been set, the process will then terminate. Otherwise, the
process will return to step S280 where a new message will be acquired
from the FEL input queue.
[0403] FIG. 54 is a flow chart of the overall bending process during
execution of a single bend. In execution of the bending process, in a
first step S298, the robot places the part into the die space.
Thereafter, the part is aligned in the X, Y and rotation directions. This
alignment is part of the backgaging operation. In step S300, the press
table is raised to the pinch point, i.e., the point at which the die
contacts the workpiece, which in turn engages with the punch tool so that
the workpiece is in a semi-stable state pinched between the die and tool
punch. In step S302, the bend is executed with bend following (i.e., with
the robot gripper maintaining its hold on the workpiece throughout the
execution of the bend). Thereafter, in step S304, the press brake will be
opened. Then, in step S306, the part is unloaded from the die space. Once
the part is unloaded, the bend is completed.
[0404] FIG. 55 illustrates the robot task 92 and the various functions
that may be provided therein, including general motion functions and
sensor-based motion functions. The general motion functions may include a
joint space move a cartesian move, and rotation about a point. The
sensor-based motion functions may include a guarded move, bend following,
open loop bend, active damping, contact control, and compliant-part
loading. Compliant-part loading comprises loading a vibrating
compliant-part into the die space of the proper timing so that the part
fits in the die space and does not collide with the workstation.
[0405] FIG. 56 illustrates the press and L/UL (loader/unloader) task 94,
and the various functions that may be provided within the task. The
functions that may be provided for controlling the press may include
raise press, lower press, and bend. The L/UL functions may include a load
workpiece, release workpiece, grasp product, and unload product.
[0406] FIG. 57 illustrates the backgage task 9-6, and the various
functions that may be provided therein. The backgage task may include
general motion functions and sensor-based motion functions. One general
motion function may include a move function. The sensor-based motion
functions may include a find part edge and a guarded move function.
[0407] 8. Learning for Speed and Quality
[0408] The bend system illustrated herein may be provided with one or more
mechanisms for learning from the results of the one or more initial runs
of a plan, and for modifying the plan accordingly in order to improve the
speed of operations and to also improve the quality of the resulting
workpiece. In this regard, a sensor-based control mechanism may be
provided for performing an operation, including moving a workpiece from
one position to another. The bending apparatus may use a sensor output to
modify the movement of the workpiece, but measure the amount by which the
movement of the workpiece is modified due to the sensor output. Then, by
learning the amount by which the movement of the workpiece was modified,
the operation may-then be controlled, based upon what was learned, so
that the workpiece is moved from one position to another without
modifying the movement of the workpiece utilizing a sensor output.
[0409] FIG. 58 illustrates an example process for performing learning
measurements and for modifying movement control during multiple
executions of a generated bend sequence plan, where the movement of the
workpiece from one position to another comprises droop compensation and
backgaging in the X direction. The sensor output comprises a measured
amount of X offset and a measured amount of droop offset of the part.
[0410] In a first step of the illustrated process, S308, the part is
loaded for bending using droop sensing. The amount of offset of the part,
i.e., the amount by which the part is drooping, is sensed and sent back
to the planner (e.g., planner 72 illustrated in FIGS. 5A and 6). Then, in
step S312, the part is side-gaged (gaged in the X direction) to obtain an
X offset value. The X offset value detected for this bend is sent back to
the planner (or the process manager). Backgaging is then performed to
align the part in the Y direction and also to appropriately rotate the
part so that it is in the appropriate yaw position. In step S318, the
bend is then performed.
[0411] In step S320, a determination is made as to whether or not there
are more bends to be performed in the present bend sequence being
executed. If so, the process returns to step S308, where steps S308-S313
are again performed to obtain values corresponding to that next bend. If
all of the bends have been completed, the process proceed from step S320
to step S322, at which point the finished part is unloaded, and a new
workpiece is loaded with the loader/uploader. Then in step S324, the part
is loaded for bending using the measured droop offset and measured X
offset values that were previously determined and forwarded to the
planner. By using such values, the bending apparatus can position the
workpiece without performing sensor-based control (or at least with a
simplified sensor-based control method) while positioning the workpiece.
This should greatly increase the speed with which the workpiece is
introduced into the die space, and reduce. Then, in step S326, backgaging
is performed to align the part in the Y and rotation (yaw) directions.
The bend is then performed in step S328, and a determination is then made
in step S330 as to whether mare bends in the bend sequence still have to
be performed. If all the bends have been performed, the process proceeds
to step S332, at which point a determination is made as to whether more
parts are to be made. If more parts are to be made, the process returns
to step S322.
[0412] Due to the repeatability of a typical bending workstation, such as
the Amada BM100 bending workstation, the offset values only need to-be
determined by performing one or a few execution runs of the system. Once
the offset values are determined, the offset values may be used for
future batch runs of the system, and should be considered dependable for
many runs. Accordingly, the process in FIG. 58 is illustrated as
returning from step S232 to step S322 for each new workpiece to be
formed, rather than returning all the way back to step S308 for obtaining
new offset values.
[0413] 9. Costing, Scheduling, Part Design and Assembly
[0414] The present invention is described as being directed to methods and
subsystems provided in an intelligent design, planning and manufacturing
system for producing materials such as bent sheet metal parts. The
present invention may be further utilized for performing such functions
as costing (i.e., determining how much it will cost to develop certain
types of parts with a given sheet metal bending work station), scheduling
(e.g., determining how much time it will take to perform to manufacture
various parts with a given sheet metal bending work station) and part
design and assembly. The planning system 71 of the present invention
(e.g., as disclosed in FIG. 5A) is capable of generating a complete
sequence of bends and bend-related operations which will be needed to
form a given part. The generated sequence of operations may be
accompanied by a complete plan which specifies all steps needed to
execute the bend sequence in a proper order by the sheet metal bending
work station. In generating the bend sequence, the planning system 71,
through use of experts/subplanners, will determine the consequences of
performing each bend and other accompanying operations within the bend
sequence Accordingly, without actually executing the resulting plan
generated by planning system 71, planning system 71 will have information
as to what the likely amount of time it will take to perform all of the
necessary operations to manufacture the part with the sheet metal bending
work station. In addition, the planning system S1 will be able to further
confirm whether or not the sheet metal bending work stations and
available tooling are capable of forming a particular designed part. By
knowing the consequences of performing the various operations in a given
plane planning system 71 can determine the resulting casts, and such
information may be utilized to evaluate the cast of producing a given set
of parts that form a desired assembly.
[0415] In addition, planning system 71 will be able to determine factory
scheduling with its information regarding the time needed to complete
various operations of the plan. In addition, by knowing the limitations
of producing a particular part, the amount of time it would take to
produce the part and the costs, it will be possible to utilize such
information to generate alternative part designs which may result in less
cast and less time needed for production of the part
[0416] While planning system 71 has been described specifically as
comprising a plurality of experts, with each expert being implement in
the form of a module which is separate from bend sequence planning module
72, planning system 71 may be implemented without being separated into
modules. Far example, planning system 71 may be implemented as one
overall operations planning module. In addition, in the implementation
shown in FIG. 8A, the language utilized to communicate between the
respective modules may be a language other than FEL.
[0417] The modular structure shown in FIG. 5A, which utilizes a
query-based language, formalizes the interface between the modules,
resulting in an open architecture which can easily be expanded upon by
adding further modules, and/or by modifying the modules of the planning
system other modifications within the general spirit of planning system
71 of the invention may be made. In order to enhance the speed of
operations performed by planning system 71, such as the embodiment shown
in FIG. 5A, each module (i.e., bend sequence planner 72 and subplanners
80, 82, 84 and 85) may be implemented on a different computer/processor
[0418] While the invention has been described with reference to several
illustrative embodiments, it is understood that the words which have been
used herein are words of description, rather than words of limitations
changes may be made, within the purview of the appended claims without
departing from the scope and the spirit of the invention in its aspects.
Although the invention has been described herein in reference to
particular means, materials, and embodiments, it is understood that the
invention is not to be limited to the particulars disclosed herein, and
that the invention extends to all equivalent structures, methods, and
uses such as are with in the scope of the appended claims.
* * * * *